Prioritize Minimum Staffing in Schedule Generation

Use minimum staffing levels from staffing plans to guide schedule generation. When a minimum staffing level is defined in the staffing grid, schedule generation prioritizes valid assignments or generated shifts that help reach that baseline staffing level.

Minimum staffing is used as a generation preference. It doesn’t override worker eligibility, work patterns, scheduling rules, or other hard constraints.

  • Prioritize assignments that reduce minimum staffing gaps when multiple valid assignment options exist.
  • Apply minimum staffing preferences during fixed time pattern generation, automatic assignment, assign open shifts, and open shift generation.
  • Staff as close as possible to the configured minimum when the full minimum can’t be reached.

Try It Out

  • Configure minimum staffing in a staffing grid.
  • Run schedule generation, automatic assignment, assign open shifts, or open shift generation. When multiple valid options exist, the generation process prioritizes the option that best reduces the minimum staffing gap.

Improve staffing coverage by aligning schedule-generation outcomes with configured minimum staffing targets. This helps reduce staffing gaps while upholding established workforce rules and constraints.

Steps to enable and configure

Configure the minimum staffing level in the staffing grid. You can update minimum staffing by interval.

Tips and considerations

  • Minimum staffing applies when workload is defined with a staffing plan using Fixed or Staffing Ratio calculation; minimum staffing isn’t used when the staffing grid calculation type is None.

Key resources

Access requirements

Users need this privilege to use workforce labor optimization features.

Privilege Code Description
Use Workforce Labor Optimization HTS_USE_WORKFORCE_LABOR_OPTIMIZATION Allows use of workforce labor optimization features.