JavaScript is required to for searching.
Skip Navigation Links
Exit Print View
Sun Datacenter InfiniBand Switch 648 Topic Set
search filter icon
search icon

Document Information

Preface

Related Documentation

Documentation, Support, and Training

Third-Party Web Sites

Sun Welcomes Your Comments

Administration

Administering the Switch

Understanding Administrative Commands

Monitoring the Switch

Monitoring the InfiniBand Fabric

Controlling the Switch

Controlling the InfiniBand Fabric

Diagnosing a Problem

Identifying the Problem

Checking Logs and Error Messages

Switch Event Message Overview

Display the Switch Message Log for Power Supplies

Display the Switch Message Log for Fabric Cards

Display the Switch Message Log for Line Cards

Display the System Event Log

Checking Status LEDs

Check Power Supply LEDs

Check CMC Status LEDs

Check the NET MGT LEDs

Check Fabric Card LEDs

Check Fan LEDs

Check Line Card LEDs

Check Link LEDs

Troubleshooting the Switch

Switch Hardware Problems

InfiniBand Fabric Problems

Understanding Signal Routing Through the Switch

CXP Connectors and LEDs to Line Card Switch Chip and Port Routes

Line Card Switch Chip to Line Card XBOW Connector Routes

Fabric Card XBOW Connector to Fabric Card Switch Chip Routes

Fabric Card Switch Chip to Fabric Card XBOW Connector Routes

Line Card XBOW Connector to Line Card Switch Chip Routes

Line Card Switch Chip and Port to CXP Connector and LED Routes

Signal Route Through the Switch

Understanding Switch Startup and Component Addition

Switch Startup Process

Fabric Card Addition Process

Line Card Addition Process

Switch GUIDs Overview

Remote Management

Understanding ILOM on the Switch

ILOM Documentation

ILOM Overview

Supported Features

Understanding ILOM Targets

Installing the ILOM Firmware

Firmware Layout

rupgrade_tool Application

Download the ILOM Firmware

Install the ILOM Firmware

Administering ILOM (CLI)

CLI Overview

Access ILOM From the CLI

Switching Between the ILOM Shell and the Linux Shell

Monitoring ILOM Targets (CLI)

Controlling ILOM Targets (CLI)

Upgrading the Switch Firmware Through ILOM (CLI)

Administering ILOM (Web Interface)

Web Interface Overview

Access ILOM From the Web Interface

Monitoring ILOM Targets (Web Interface)

Controlling ILOM Targets (Web Interface)

Upgrading the Switch Firmware Through ILOM (Web Interface)

Understanding ILOM Commands

cd Command

create Command

delete Command

dump Command

exit Command

help Command

load Command

set Command

show Command

version Command

Installation

Preparing the Site

Routing Service Cables

Understanding InfiniBand Cabling

Understanding Switch Specifications

Installing the Switch

Understanding the Installation

Installing the InfiniBand Software Stack

Unpacking the Chassis

Preparing the Chassis

Inspecting the Components

Installing the Components

Powering On the CMCs

Powering On the Fabric Cards

Powering On the Line Cards

Connecting InfiniBand Cables

Verifying the InfiniBand Fabric

Service

Servicing the Switch

Understanding Service Procedures

Servicing the Power Supplies

Servicing the CMCs

Servicing the Fans

Servicing the Fabric Cards and Fabric Card Fillers

Servicing the InfiniBand Cables

Servicing the Line Cards

Doing Supportive Software Tasks

Reference

Command Reference

Understanding Switch-Specific Commands

Understanding CLIA Commands

Understanding InfiniBand Software Commands

Index

Switch Startup Process
  1. Switch startup commences when standby power is enabled for the Chassis Management Controllers (CMCs). Standby power is applied when the power supplies are energized.

  2. The redundant CMCs perform self-tests and determine if the other instance is present and operational. The CMCs then negotiate active and standby roles.

  3. The active CMC becomes available on the management network.

  4. The CMC checks that the required number of power supplies are present and operational in each power domain, and then activates full power mode for each power supply.

  5. If the power supply population is functional, commands to the CMC enable standby power for each fabric card and line card. Standby power is provided to each card sequentially to avoid overloading the power supplies.

  6. The CMC performs further discovery and checks of the fabric cards and line cards using Intelligent Platform Management interface (IPMI) communication with the Intelligent Platform Management controllers (IPMCs) in the fabric cards and line cards.


    Note - Conversion from standby to full-power mode can be an automatic or explicitly controlled operation.


  7. The CMC determines if the available power is sufficient for the number of fabric cards and line cards in each power domain, and then sends commands to the CMC to initiate power-on sequencing. All the fabric cards are powered on first, followed by the line cards.

  8. After power-on of each fabric card, the CMC checks that a sufficient number of fans on the fabric card are fully operational. If too few fans are operational, the fabric card is shut down.

  9. Completing the fabric card power-on, the CMC checks that both the card and supplied power status is okay.

  10. When all fabric cards have been powered on and checked, the CMC re-evaluates the cooling capacity to ensure that line cards are only powered on if sufficient cooling capacity is available.

  11. The line cards are then powered on, as directed by commands to the CMC.

  12. When a fabric card or line card is instructed to go to full power, the card’s on-board IPMC verifies that the local power sensors indicate okay status, and then enables power for the switch chips.

  13. The IPMC performs basic card self-test functions that include being able to read sensible data from the key I2C slave devices on the card. The switch chips also have I2C slave devices.

  14. The IPMC constantly monitors the various sensors and signals on the card, including cable and link status.

  15. The IPMC enables all InfiniBand ports and links on the fabric cards, and all internal ports and links on the line cards. The CXP connectors on the line cards are not enabled until the IPMC is instructed to do so by the CMC.

  16. After power sequencing and basic tests have been completed, the IPMC reports the card as operational to the CMC.

  17. When the CMC has received operational status confirmation from all cards, the CMC correlates InfiniBand link state information to verify that all relevant internal links have become operational.

  18. Links that fail to become operational are recorded.

  19. The CMC then instructs the IPMCs on the line cards to enable external links through the CXP connectors on the line cards.