Chapter 2 Hardware Installation and Removal
Observing ESD and Handling Precautions
Connecting the Cables to the HBA
To Connect the Cables to the HBA
Fibre Channel LED Indicator Status
Power and Attention Switch LED Scheme
Configuring the HBA for Hot-Plug Operation
To Configure the HBA for Hot-Plug Operation
Testing the Installation for the Windows OS
Testing the Installation for the VMware Technology
To Prepare the HBA for Removal Using the HBA Attention Button
To Prepare the HBA for Hot-Plug Removal Using the Oracle Solaris OS
# cfgadm
If the HBA is properly installed and connected, you will see output similar to the following.
Ap_Id Type Receptacle Occupant Condition c3 fc connected configured ok c4 fc connected configured ok pcie5 ethern/hp connected configured ok