Chapter 2 Hardware Installation and Removal
Observing ESD and Handling Precautions
Connecting the Cables to the HBA
To Connect the Cables to the HBA
Fibre Channel LED Indicator Status
Configuring the HBA for Hot-Plug Operation
To Configure the HBA for Hot-Plug Operation
To Test the Installation for the Oracle Solaris OS
Testing the Installation for the Windows OS
Testing the Installation for the VMware Technology
To Prepare the HBA for Removal Using the HBA Attention Button
To Prepare the HBA for Hot-Plug Removal Using the Oracle Solaris OS
Power and Attention LED Scheme summarizes the Power and Attention switch LED combination (LEDs 9 and 10 in LED Locations).
|