Index

A

accessing inventory plan options link
Analysis Workbench
  overview link
  using link
analyzing
  impact of user-specified safety stock link
  inventory budgets link
  inventory plans link
  postponement implementation link
  revenue and cost breakdown link
  safety stocks link
  service level breakdown link
  service level versus profit link
APCC
  launching IO plans link
  managing IO plans link
APCC measures
  for inventory analysis link
asset intensive planning
  computing total demand link
  eAM activity definition link
  IMM rebuild activity link
  introduction link
  process overview link
assigning
  forecast sets to scenario sets link
  forecasts to scenario sets link

B

BIS key performance indicators link
budget constraints
  enforcing link
business process flow
  between Oracle Demand Planning and Oracle Inventory Optimization link

C

calculating safety stock
  introduction to cycle inventory link
capacity constraints
  enforcing link
computing total demand
  asset intensive planning link
constraints
  enforcing link
Constraints tabbed region link
copying inventory plans link
creating
  preference sets link
creating new categories and category sets
  policy planning link
cumulative demand distribution link
cycle inventory
  calculating safety stock link
  enabling cycle stock functionality link
  requirements explosion de-rating link
  target service level de-rating link

D

defining
  budgets
    prerequisites link
  inventory budget link
  safety stock level link
  target service level
    plan link link
  user-specified safety stock link
defining item order modifiers
  warehouse capacity constraints link
defining item volume
  warehouse capacity constraints link
defining storage capacity at the category level
  warehouse capacity constraints link
defining warehouse capacity at the organization level
  warehouse capacity constraints link
demand distribution link
Demand Planning
  intermittent demand attributes link
demand probability link
demand schedule from an inventory plan link
demand schedules link
demand source link
demand sources link
demand variability
  setting link
determining
  plan start date link

E

eAM activity definition
  asset intensive planning link
editing
  preference sets link
enabling cycle stock functionality
  cycle inventory link
enforcing
  budget constraints link
  budgets link
  capacity constraints link
  constraints link
  service level constraints link
exception messages
  viewing link

F

flexfield attributes link
forecast accuracy
  measurement link
forecast set link
forecast spreading link
forecasts link
functional components
  policy planning link
future plan start date link

G

generating
  safety stock level link
group service level targets link
  Inventory Optimization link
group target levels
  determining link

H

Horizontal Plan window link

I

IMM inputs
  policy planning link
IMM rebuild activity
  asset intensive planning link
inflated safety stock link
inputs to Oracle Inventory Optimization link
integrating Oracle Inventory Optimization and Oracle Demand Planning link
intermittent demand
  setting link
intermittent demand attributes
  Inventory Optimization link
introduction
  policy planning link
inventory analysis
  APCC measures link
inventory budget
  defining link
  enforcing link
inventory budget analysis link
Inventory Budget Analysis page link
Inventory Optimization plans
  managing in APCC link
Inventory Plan
  Item Attribute Simulation Sets link
inventory plan
  copying link
  defining target service level link link
  prerequisites for running link
  running link
inventory plan options
  accessing link
  overview link
  setting up link
Inventory Plans
  analyzing link
io parameter calculations
  policy planning link
item purchase price by supplier
  setting link
  viewing link

K

Key Indicators window link
key performance indicators link

L

launch plan
  parameters link
launch plans
  within APCC link
Lead time variability
  manufacturing for an item link

M

Main tabbed region link
managing policy parameter sets
  policy planning link
manufacturing lead time variability
  for a plan link
material/resource availability
  viewing link
measuring forecast accuracy link
MSC: IO_UI_PERSETNAME link
MSR Profile Options link
MSR: Budget Category Set link
MSR: Enable Cycle Stock Adjustment link
MSR: Postponement Factor link
MSR: Probability Distribution Type link link
MSR: Safety Stock Holding Strategy link

O

Oracle Business Intelligence System link
Oracle Inventory Optimization
  business process link
  Evaluation of multiple service levels link
  inputs to link
  integrating with Oracle Service Parts Planning link
  integration with Oracle Demand Planning link
  output from link
  overview link
  setting up link
organization level constraints
  introduction link
Organizations tabbed region link
output from Oracle Inventory Optimization link
overview
  inventory plan options link
  viewing output link

P

page
  Inventory Budget Analysis link
  Postponement Analysis link
  Preferences link
  Safety Stock Analysis link
  Service Level Breakdown link
  Service Level versus Profit Analysis link
parameters
  launch plan link
penalty costs
  setting link
penalty factors link
performance indicators
  setting link
  viewing link
Personal Profile Values window link
plan end date link
Plan Options window link
  Main tabbed region link
  Organization tabbed region link
plan start date link
plan start date in future link
Planned Items
  ABC Classification link
planned items
  selecting link
planning
  safety stock for co-products link link
  safety stock for components link link
planning safety stock for
policy parameters
  viewing in Material Plan link
policy planning
  creating new categories and category sets link
  functional components link
  IMM inputs link
  introduction link
  io parameter calculations link
  managing policy parameter sets link
  publishing parts classification link
  setting up policy parameters link
  specifying policy details link
Postponement Analysis page link
postponement implementation analysis link
preference sets
  creating link
  editing link
Preferences page link
probability data
  how it's used link
probability of forecasts link
profile options link
  automatic calculations link
  flexfield attributes link
  floating point precision link
  introduction link
Profile Options MSR:Postponement link
publishing parts classification
  policy planning link
pushing warehouse capacity facts to APCC
  warehouse capacity constraints link

Q

quick simulation
  running link

R

requirements explosion de-rating
  cycle inventory link
Resource Availability Summary window link
resource requirements
  viewing link
Resource Requirements window link
revenue and cost breakdown analysis link
reviewing exception messages link
running inventory plans link
  prerequisites link

S

safety stock
  user-specified link
  viewing link
Safety Stock Analysis page link
safety stock change interval link
safety stock change threshold interval link
safety stock inflation link
safety stock level
  days of supply link
  defining link
  generating link
safety stock push down to downstream locations
  warehouse capacity constraints link
safety stock smoothing link
safety stocks analysis link
scenario set link
selecting planned items link
service level breakdown analysis link
Service Level Breakdown page link
service level constraints
  enforcing link
service level versus profit analysis link
Service Level versus Profit Analysis page link
setting
  item purchase price by supplier link
  penalty costs link
  performance indicators link
  supplier lead time variability link
  target service levels link
setting demand variability link
setting up
  inventory plan options link
  user-specified safety stock link
setting up policy parameters
  policy planning link
smoothening safety stock link
Specify Budget window link
specifying
  demand schedules link
  sources of demand link
specifying inventory days increment
  warehouse capacity constraints link
specifying order period
  warehouse capacity constraints link
specifying policy details
  policy planning link
specifying safety stock days
  warehouse capacity constraints link link
specifying the enforce warehouse capacity constraints plan option
  warehouse capacity constraints link
stochastic optimization technology link
Supplier Capacity window link
supplier lead time variability
  setting link
supply variability
  accounting for link
  in warehouse capacity constraints link
Supply/Demand window link link

T

target safety stock
  viewing link
target service level de-rating
  cycle inventory link
target service levels
  setting link
time-phased supply and demand
  viewing link

U

user specified safety stock
  defining link
user-specified safety stock
  analysis link
  viewing link
user-specified safety stock link
  setting up link

V

viewing
  exception messages link
  item purchase price by supplier link
  material/resource availability link
  plan end date link
  resource requirements link
  safety stock link
  target safety stock link
  time-phased supply and demand link
  user-specified safety stock link

W

warehouse capacity constraints
  defining item order modifiers link
  defining item volume link
  defining storage capacity at the category level link
  defining warehouse capacity at the organization level link
  introduction link
  organization level constraints link
  pushing warehouse capacity facts to APCC link
  safety stock push down to downstream locations link
  specifying inventory days increment link
  specifying order period link
  specifying safety stock days link link
  specifying the enforce warehouse capacity constraints plan option link
  supply variability link
  warehouse capacity exceeded exception link
warehouse capacity exceeded exception
  warehouse capacity constraints link
warehouse constraints
  setting up link
weighed average calculation link
window
  Horizontal Plan link
  Key Indicators link
  Personal Profile Values link
  Plan Options link
  Resource Availability Summary link
  Resource Requirements link
  Specify Budget link
  Supplier Capacity link
  Supply/Demand link