21/21
Index
A
accessing inventory plan options
link
Analysis Workbench
overview
link
using
link
analyzing
impact of user-specified safety stock
link
inventory budgets
link
inventory plans
link
postponement implementation
link
revenue and cost breakdown
link
safety stocks
link
service level breakdown
link
service level versus profit
link
APCC
launching IO plans
link
managing IO plans
link
APCC measures
for inventory analysis
link
asset intensive planning
computing total demand
link
eAM activity definition
link
IMM rebuild activity
link
introduction
link
process overview
link
assigning
forecast sets to scenario sets
link
forecasts to scenario sets
link
B
BIS key performance indicators
link
budget constraints
enforcing
link
business process flow
between Oracle Demand Planning and Oracle Inventory Optimization
link
C
calculating safety stock
introduction to cycle inventory
link
capacity constraints
enforcing
link
computing total demand
asset intensive planning
link
constraints
enforcing
link
Constraints tabbed region
link
copying inventory plans
link
creating
preference sets
link
creating new categories and category sets
policy planning
link
cumulative demand distribution
link
cycle inventory
calculating safety stock
link
enabling cycle stock functionality
link
requirements explosion de-rating
link
target service level de-rating
link
D
defining
budgets
prerequisites
link
inventory budget
link
safety stock level
link
target service level
plan
link link
user-specified safety stock
link
defining item order modifiers
warehouse capacity constraints
link
defining item volume
warehouse capacity constraints
link
defining storage capacity at the category level
warehouse capacity constraints
link
defining warehouse capacity at the organization level
warehouse capacity constraints
link
demand distribution
link
Demand Planning
intermittent demand attributes
link
demand probability
link
demand schedule from an inventory plan
link
demand schedules
link
demand source
link
demand sources
link
demand variability
setting
link
determining
plan start date
link
E
eAM activity definition
asset intensive planning
link
editing
preference sets
link
enabling cycle stock functionality
cycle inventory
link
enforcing
budget constraints
link
budgets
link
capacity constraints
link
constraints
link
service level constraints
link
exception messages
viewing
link
F
flexfield attributes
link
forecast accuracy
measurement
link
forecast set
link
forecast spreading
link
forecasts
link
functional components
policy planning
link
future plan start date
link
G
generating
safety stock level
link
group service level targets
link
Inventory Optimization
link
group target levels
determining
link
H
Horizontal Plan window
link
I
IMM inputs
policy planning
link
IMM rebuild activity
asset intensive planning
link
inflated safety stock
link
inputs to Oracle Inventory Optimization
link
integrating Oracle Inventory Optimization and Oracle Demand Planning
link
intermittent demand
setting
link
intermittent demand attributes
Inventory Optimization
link
introduction
policy planning
link
inventory analysis
APCC measures
link
inventory budget
defining
link
enforcing
link
inventory budget analysis
link
Inventory Budget Analysis page
link
Inventory Optimization plans
managing in APCC
link
Inventory Plan
Item Attribute Simulation Sets
link
inventory plan
copying
link
defining target service level
link link
prerequisites for running
link
running
link
inventory plan options
accessing
link
overview
link
setting up
link
Inventory Plans
analyzing
link
io parameter calculations
policy planning
link
item purchase price by supplier
setting
link
viewing
link
K
Key Indicators window
link
key performance indicators
link
L
launch plan
parameters
link
launch plans
within APCC
link
Lead time variability
manufacturing for an item
link
M
Main tabbed region
link
managing policy parameter sets
policy planning
link
manufacturing lead time variability
for a plan
link
material/resource availability
viewing
link
measuring forecast accuracy
link
MSC: IO_UI_PERSETNAME
link
MSR Profile Options
link
MSR: Budget Category Set
link
MSR: Enable Cycle Stock Adjustment
link
MSR: Postponement Factor
link
MSR: Probability Distribution Type
link link
MSR: Safety Stock Holding Strategy
link
O
Oracle Business Intelligence System
link
Oracle Inventory Optimization
business process
link
Evaluation of multiple service levels
link
inputs to
link
integrating with Oracle Service Parts Planning
link
integration with Oracle Demand Planning
link
output from
link
overview
link
setting up
link
organization level constraints
introduction
link
Organizations tabbed region
link
output from Oracle Inventory Optimization
link
overview
inventory plan options
link
viewing output
link
P
page
Inventory Budget Analysis
link
Postponement Analysis
link
Preferences
link
Safety Stock Analysis
link
Service Level Breakdown
link
Service Level versus Profit Analysis
link
parameters
launch plan
link
penalty costs
setting
link
penalty factors
link
performance indicators
setting
link
viewing
link
Personal Profile Values window
link
plan end date
link
Plan Options window
link
Main tabbed region
link
Organization tabbed region
link
plan start date
link
plan start date in future
link
Planned Items
ABC Classification
link
planned items
selecting
link
planning
safety stock for co-products
link link
safety stock for components
link link
planning safety stock for
policy parameters
viewing in Material Plan
link
policy planning
creating new categories and category sets
link
functional components
link
IMM inputs
link
introduction
link
io parameter calculations
link
managing policy parameter sets
link
publishing parts classification
link
setting up policy parameters
link
specifying policy details
link
Postponement Analysis page
link
postponement implementation analysis
link
preference sets
creating
link
editing
link
Preferences page
link
probability data
how it's used
link
probability of forecasts
link
profile options
link
automatic calculations
link
flexfield attributes
link
floating point precision
link
introduction
link
Profile Options MSR:Postponement
link
publishing parts classification
policy planning
link
pushing warehouse capacity facts to APCC
warehouse capacity constraints
link
Q
quick simulation
running
link
R
requirements explosion de-rating
cycle inventory
link
Resource Availability Summary window
link
resource requirements
viewing
link
Resource Requirements window
link
revenue and cost breakdown analysis
link
reviewing exception messages
link
running inventory plans
link
prerequisites
link
S
safety stock
user-specified
link
viewing
link
Safety Stock Analysis page
link
safety stock change interval
link
safety stock change threshold interval
link
safety stock inflation
link
safety stock level
days of supply
link
defining
link
generating
link
safety stock push down to downstream locations
warehouse capacity constraints
link
safety stock smoothing
link
safety stocks analysis
link
scenario set
link
selecting planned items
link
service level breakdown analysis
link
Service Level Breakdown page
link
service level constraints
enforcing
link
service level versus profit analysis
link
Service Level versus Profit Analysis page
link
setting
item purchase price by supplier
link
penalty costs
link
performance indicators
link
supplier lead time variability
link
target service levels
link
setting demand variability
link
setting up
inventory plan options
link
user-specified safety stock
link
setting up policy parameters
policy planning
link
smoothening safety stock
link
Specify Budget window
link
specifying
demand schedules
link
sources of demand
link
specifying inventory days increment
warehouse capacity constraints
link
specifying order period
warehouse capacity constraints
link
specifying policy details
policy planning
link
specifying safety stock days
warehouse capacity constraints
link link
specifying the enforce warehouse capacity constraints plan option
warehouse capacity constraints
link
stochastic optimization technology
link
Supplier Capacity window
link
supplier lead time variability
setting
link
supply variability
accounting for
link
in warehouse capacity constraints
link
Supply/Demand window
link link
T
target safety stock
viewing
link
target service level de-rating
cycle inventory
link
target service levels
setting
link
time-phased supply and demand
viewing
link
U
user specified safety stock
defining
link
user-specified safety stock
analysis
link
viewing
link
user-specified safety stock
link
setting up
link
V
viewing
exception messages
link
item purchase price by supplier
link
material/resource availability
link
plan end date
link
resource requirements
link
safety stock
link
target safety stock
link
time-phased supply and demand
link
user-specified safety stock
link
W
warehouse capacity constraints
defining item order modifiers
link
defining item volume
link
defining storage capacity at the category level
link
defining warehouse capacity at the organization level
link
introduction
link
organization level constraints
link
pushing warehouse capacity facts to APCC
link
safety stock push down to downstream locations
link
specifying inventory days increment
link
specifying order period
link
specifying safety stock days
link link
specifying the enforce warehouse capacity constraints plan option
link
supply variability
link
warehouse capacity exceeded exception
link
warehouse capacity exceeded exception
warehouse capacity constraints
link
warehouse constraints
setting up
link
weighed average calculation
link
window
Horizontal Plan
link
Key Indicators
link
Personal Profile Values
link
Plan Options
link
Resource Availability Summary
link
Resource Requirements
link
Specify Budget
link
Supplier Capacity
link
Supply/Demand
link