Understanding the Installation
Understanding Management and Power Cabling
Management Connection Overview
Single-Switch Location Guidelines
Attach the Rails to the Switch
Attach Telco Adapters to the Rack Slides
Attach the Rack Slides to the Rack
Install the Switch Into the Rack
Install the Air Duct and Front Support
Attach Data and Management Cables
Prepare the Front Support and Small Air Duct
Verify the DHCP-Assigned IP Address and Host Name
Configure Network Management From the CLI (SER MGT)
Log Into the Oracle ILOM Web (NET MGT)
Log Into the Oracle ILOM CLI (NET MGT)
SER MGT Port
SER MGT Port
Log Into the Oracle ILOM CLI (SER MGT)
SER MGT Port
Assemble an SFP+ Data Cable
SFP+ Data Cable Overview
SFP+ Data Cable Overview
Confirming Specifications
Environmental Specifications
Electrical Specifications
Environmental Specifications
Physical Specifications
Power Cord Specifications
Attach the Rails to the Switch
Installing the Switch
Install the Switch Into the Rack
Power On the Switch
Preparing for Installation
Single-Switch Location Guidelines
Verify Switch Kit Contents