Skip Headers
Oracle® Argus Mart Installation and Administration Guide
Release 7.0.3
E48402-01
Contents
Index
Previous
Next
List of Figures
2-1 Installation Progress: Installing the AM Application
2-2 Welcome Screen
2-3 About Oracle Universal Installer
2-4 List of Installed Products
2-5 Specify Home Details Screen
2-6 Oracle Home Location Screen
2-7 Database Details Screen
2-8 Summary Screen
2-9 End Of Installation Screen
2-10 Verifying Successful Argus Mart Installation
2-11 Exit Confirmation Window
3-1 Installation Progress: Creating the Argus Mart Data Structure
3-2 Schema Creation Tool
3-3 Schema Creation Tool: Creating Argus Safety User
3-4 Oracle Database Connect Dialog Box
3-5 Argus Safety User Creation Dialog Box
3-6 New User Dialog Box
3-7 Argus Safety User Creation
3-8 Save Log File Dialog Box
3-9 Saving Log File
3-10 Entering Password for the SYSTEM User
3-11 Verifying User and Database Details
3-12 Verifying AS Database, User, and Log File Details
3-13 User Creation Confirmation
3-14 Clearing Cache
3-15 Schema Creation Tool: Create Schema
3-16 Connecting to Argus Mart Database
3-17 Argus Mart Schema Creation Options Dialog Box
3-18 New User Dialog Box
3-19 Creating VPD Admin User
3-20 Selecting Users in the Argus Mart Schema Creation Options Dialog Box
3-21 Safety Database Link Information Details
3-22 Oracle Database Connect: Argus Stage User Password
3-23 Oracle Database Connect: Argus Mart User Password
3-24 SYS User Details
3-25 Verifying User and Argus Mart Database Details
3-26 Tablespace Creation Dialog Box
3-27 Generating DataFile Path and Name
3-28 Argus Mart Database Installation Dialog Box
3-29 Argus Mart Database Successful Installation: Confirmation Screen
3-30 Schema Creation Tool
3-31 The Connect to Argus Mart Database Screen
3-32 Entering Argus Mart User Password
3-33 Verifying the Argus Mart User and Database Details
3-34 Loading Factory Data
3-35 Loading Factory Data Successful: Confirmation Screen
3-36 Schema Creation Tool: Validating the Schema
3-37 Schema Validation: Connecting to Argus Mart Database
3-38 Schema Validation Utility Dialog Box
3-39 Schema Validation: Selecting CTL File
3-40 Schema Validation: Selecting Folder for the Log Files
3-41 Schema Validation: Log Files Location
3-42 Entering SYSTEM User Password
3-43 Verifying User and Database Details
3-44 Verifying other Details
3-45 Entering Database Administrator Password
3-46 Schema Validation: Successful Confirmation Screen
4-1 Installation Progress: Creating Multiple Enterprises in Multi-tenant Environment
4-2 Entering TNS Name to Connect to Database
4-3 Entering Argus ETL User
4-4 Connecting to the Database
4-5 Displaying List of Enterprises to be Created in Argus Mart
4-6 Displaying Enterprise Creation Confirmation
5-1 Installation Progress: Configuring ODI Settings
5-2 Minimum Components Required for Setting-up ODI
5-3 Creating Master Repository
5-4 Master Repository Creation Wizard
5-5 Connection Successful Confirmation Message
5-6 Authentication Screen
5-7 Password Storage Screen
5-8 Creating Master Repository
5-9 Master Repository Creation Successful Confirmation Message
5-10 Creating Login for Master Repository
5-11 Repository Connection Information
5-12 New Work Repository Option
5-13 Specify ODI Work Repository connection properties screen
5-14 Specify ODI Work Repository properties screen
5-15 Creating Work Repository
5-16 Displaying the Option to Create Work Repository Login
5-17 Viewing New Work Repository
5-18 Creating Login for Work Repository
5-19 Repository Connection Information
5-20 Import Link
5-21 Import Selection Dialog Box
5-22 Smart Import Window
5-23 Displaying Components Imported from the Zip File
5-24 Import Summary Screen
5-25 Smart Import Report
5-26 Save Report Window
5-27 Path of the Saved Report File
5-28 Report File Saved Confirmation
5-29 Verifying the Smart Import
5-30 Creating Data Server Connection
5-31 Entering Connection Details
5-32 Entering Database Details
5-33 Testing the Connection
5-34 Test Connection Dialog Box
5-35 Successful Connection Confirmation
5-36 Selecting New Physical Schema
5-37 Selecting Argus ETL User in Definition Section
5-38 Selecting Context for the Data Server
5-39 Selecting Context and Logical Schema
5-40 Viewing the New Physical Schema
5-41 Double-clicking the LP_INI_AM Load Plan
5-42 Selecting No in the Object Locking Screen
5-43 Load Plan Details
5-44 No Errors Confirmation for the Load Plan
5-45 Setting the Standalone Agent IP Address
5-46 Encoding the ODI Master Repository Password
5-47 Double-clicking the LP_INI_AM Load Plan
5-48 Adding Parallel Step to the List of Steps
5-49 Executing Load Plan Steps in Parallel
6-1 Installation Progress: Configuring the Argus Mart Application
6-2 System Management Link on Argus Safety Console
6-3 Argus Mart Link in Argus Safety Console
6-4 List of Common Profile Switches for Argus Mart
6-5 Non-Default Enterprise: List of Common Profile Switches
7-1 Steps to Upgrade Argus Mart 1.0
7-2 Argus Mart Application Upgrade Tool
7-3 Oracle Database Connect Screen
7-4 Upgrade Parameters Screen
7-5 Tablespace Management Screen
7-6 Add Data File Screen
7-7 Updated Tablespace Management Screen
7-8 Tablespace Management Screen (with Next Button Enabled)
7-9 Continue Database Upgrade Screen
7-10 Database Upgrade Completion Screen
7-11 Upgrade Script Error Screen
7-12 List of Parameters
7-13 Event List Upgrade Script: Completion Screen
8-1 Installation Progress: Extracting, Transforming, and Loading Data
8-2 Oracle Data Integrator Login Window
8-3 Load Plans and Scenarios
8-4 Load Plan for Initial ETL
8-5 Executing the Initial ETL
8-6 Start Load Plan Window
8-7 Load Plan Started Confirmation Message
8-8 Status of the Load Plan
8-9 Stopping the Initial ETL
8-10 Selecting the Physical Agent
8-11 Stopped Initial ETL Session
8-12 Restarting the Initial ETL
8-13 Restart Load Plan Dialog Box
8-14 Loan Plan restarted Confirmation Message
8-15 Restarted Load Plan
8-16 Completed Load Plan
8-17 Select Statement 1 to Verify Successful Execution
8-18 Select Statement 2 to Verify Successful Execution
8-19 Navigating to the LP_INC_AM Load Plan
8-20 Viewing Steps of the Load Plan
8-21 Viewing the Status of the ETL Process
8-22 Viewing Completed Steps in the ETL Process
8-23 Viewing the Failed ETL Process
8-24 Viewing the Failed Step for the ETL Process
8-25 Viewing the Error Message
8-26 Viewing the Error Message using the Execution Section
8-27 Viewing Error Message using SQL Developer
8-28 Viewing the Restarted ETL Process Status
8-29 Viewing the Steps of the Restarted ETL
8-30 Oracle Data Integrator Sign In Window
8-31 Oracle Data Integrator Console Screen
8-32 Scenarios/Load Plans
8-33 Executing the Initial ETL
8-34 Execute Load Plan Window
8-35 Load Plan Started Confirmation Message
8-36 Status of the Load Plan
8-37 Stopping the Initial ETL
8-38 Stop Load Plan Execution Dialog Box
8-39 Load Plan Stopped Confirmation Message
8-40 Stopped Initial ETL Session
8-41 Restarting the Initial ETL
8-42 Restart Load Plan Execution Dialog Box
8-43 Loan Plan restarted Confirmation Message
8-44 Navigating to the Load Plans
8-45 Viewing the Steps of the Load Plan
8-46 Initial ETL in Progress
8-47 Viewing Completed Steps in the ETL Process
8-48 Viewing the Failed ETL Process
8-49 Viewing the Failed Step for the ETL Process
8-50 Viewing the Error Message
8-51 Viewing the Stopped Session
8-52 Viewing the Error Details
8-53 Viewing Error Message using SQL Developer
8-54 Viewing the Restarted ETL Process Status
8-55 Viewing the Steps of the Restarted ETL
9-1 Uninstalling Argus Mart
9-2 Inventory Screen
9-3 Selecting Argus Mart for Uninstallation
9-4 Confirmation to Un-install Argus Mart
9-5 Deleting Oracle Argus Mart through Start Menu
11-1 Study is eligible for Unblinding Checkbox in Argus Safety
12-1 Scheduling ETL
12-2 Scheduling the Load Plan Dialog Box
12-3 Oracle Data Integrator Login Window
12-4 Load Plans and Scenarios
12-5 Executing the Incremental ETL
12-6 Start Load Plan Window
12-7 Load Plan Started Confirmation Message
12-8 Status of the Load Plan
12-9 Stopping the Incremental ETL
12-10 Selecting the Physical Agent
12-11 Stopped Incremental ETL Session
12-12 Restarting the Incremental ETL
12-13 Restart Load Plan Dialog Box
12-14 Loan Plan restarted Confirmation Message
12-15 Restarted Load Plan
12-16 Completed Load Plan
12-17 Staging Phase: Incremental ETL Resumes from Failed or Stopped Point
12-18 Mart Phase: Incremental ETL Resumes from the First Step of Mart
12-19 Select Statement 1 to Verify Successful Execution
12-20 Select Statement 2 to Verify Successful Execution
13-1 Oracle Data Integrator Sign In Window
13-2 Oracle Data Integrator Console Screen
13-3 Scenarios/Load Plans
13-4 Executing the Incremental ETL
13-5 Execute Load Plan Window
13-6 Load Plan Started Confirmation Message
13-7 Status of the Load Plan
13-8 Stopping the Incremental ETL
13-9 Stop Load Plan Execution Dialog Box
13-10 Load Plan Stopped Confirmation Message
13-11 Stopped Incremental ETL Session
13-12 Restarting the Incremental ETL
13-13 Restart Load Plan Execution Dialog Box
13-14 Loan Plan restarted Confirmation Message
14-1 Confirmation of Resetting the Mart Environment
14-2 Entering TNS Name to Connect to Database
14-3 Connecting to the Database
14-4 Writing Enterprise Creation Logs
15-1 Dictionary Reload Error Message
15-2 Dictionary Reload Error Message: SQL Developer
15-3 Pre-Requisite Check Failed Error
15-4 FR Consistency Error
15-5 MedDRA Mismatch Error