退出打印视图
Table 2–1 列出了首次设置新的通用 HBA 所要执行的任务,执行任务时必须遵守所列的顺序。
Preparing for Installation
To Replace the PCI Bracket
Installing and Removing SFP+ Optical Transceiver Modules
To Connect the Copper Cables
To Connect the Optical Cables