Returning the System to Operation
This section describes returning the system to operation after servicing.
Note -
Some links in this table take you to instructions that are in other documents.
Open the links in a new tab or use your browser's Back button to return to this
document.
|
|
Replace the top cover.
|
|
Return the server to the normal operating
position.
|
|
Reconnect cables.
|
|
Apply power to the storage
array.
Apply power to the compute
nodes.
|
Note -
Do not power on the compute nodes until the disks on the
storage array and storage expansion shelf have
initialized.
|
Start the system.
|
|
|