Go to main content

Oracle® MiniCluster S7-2 Service Manual

Exit Print View

Updated: April 2021
 
 

Returning the System to Operation

This section describes returning the system to operation after servicing.


Note -  Some links in this table take you to instructions that are in other documents. Open the links in a new tab or use your browser's Back button to return to this document.
Task
For More Information
Replace the top cover.
Replace the Top Cover in the SPARC S7-2 Server Service Manual
Return the server to the normal operating position.
Return the Server to the Normal Operating Position in the SPARC S7-2 Server Service Manual
Reconnect cables.
Connecting Cables in the MiniCluster S7-2 Installation Guide
Apply power to the storage array.
Apply power to the compute nodes.
Power On Procedure in this manual.

Note -  Do not power on the compute nodes until the disks on the storage array and storage expansion shelf have initialized.

Start the system.
Start the System in the MiniCluster S7-2 Administration Guide.