List of Figures
- 2-1 Low-Voltage Single Phase Power Connector
- 2-2 Low-Voltage Three-Phase Power Connector
- 2-3 High-Voltage Single Phase Power Connector
- 2-4 High-Voltage Three-Phase Power Connector
- 2-5 Typical Data Center Configuration for Perforated Floor Tiles
- 3-1 X7 Back—plane External Network Connectivity
- 3-2 Network Diagram for Recovery Appliance
- 3-3 Network Connections to the Recovery Appliance Rack Components
- 3-4 Recovery Appliance Connection to an Oracle Tape System
- 3-5 Recovery Appliance Connection to a Third-Party Tape System
- 4-1 Auto Service Request Network Connections
- 5-1 Oracle Exadata Deployment Assistant Welcome Page
- 6-1 ZDLRA Rack in Shipping Crate
- 6-2 Carefully Push ZDLRA Rack from Behind
- 6-3 Location of Leveling Feet on ZDLRA Rack
- 6-4 Securing ZDLRA Rack Using the Leveling Feet
- 6-5 Location of Leveling Feet on ZDLRA Rack X7 or later
- 6-6 Securing ZDLRA Rack Using the Leveling Feet
- 6-7 Earth Ground Attachment Bolt Location
- 6-8 Power Cord Routing Example
- 6-9 PDU Switch Locations
- 7-1 Server Expansion Kit Components
- 7-2 Removing the Rack Doors
- 7-3 Removing the Filler Panels
- 7-4 Location of the Trough
- 7-5 Aligning the Side-Rail Assembly With the Rack
- 7-6 Inserting the Server with Mounting Brackets into the Slide Rails
- 9-1 Recovery Appliance Connected to an Exadata Quarter Rack
- 9-2 Recovery Appliance Connected to an Exadata Half or Full Rack
- 9-3 Recovery Appliance Connected to Multiple Exadata Racks
- D-1 Front View of Oracle Server X7 Oracle Database Server
- D-2 Rear View of X7 Oracle Database Server
- D-3 Front View of Oracle Server X6-2 or X5-2
- D-4 Rear View of Oracle Server X6-2 or X5-2
- D-5 Front View of Sun Server X4-2
- D-6 Rear View of Sun Server X4-2
- D-7 Front View of Oracle Exadata Storage Server X7-2 High Capacity Server
- D-8 Rear View of Oracle Exadata Storage Server X7-2 High Capacity Server
- D-9 Front View of Oracle Server X6-2L or X5-2L
- D-10 Rear View of Oracle Server X6-2L or X5-2L
- D-11 Front View of Sun Server X4-2L
- D-12 Rear View of Sun Server X4-2L
- E-1 Rack Layout of the Recovery Appliance X8, X7, X6, or X5 Full Rack
- E-2 Rack Layout of the Recovery Appliance X8, X7, X6, or X5 Minimum Configuration
- F-1 Rack Layout of the Recovery Appliance X4 Full Rack
- F-2 Rack Layout of the Recovery Appliance X4 Minimum Configuration
- G-1 In-Rack Connections Between Spine Switch and Leaf Switches
- G-2 In-Rack Connections Between the Servers and the Leaf Switches
- G-3 Connecting Switches Across Two Racks
- G-4 Connecting Switches Across Eight Racks
- G-5 Connecting Switches Across 18 Racks