34/34
Index
A B C D E F G H I J L M N O P R S T U W
A
- AAIsautomatic accounting instructions, 5.2
- Account Balances table (F0902), 5.2, 19.1.4, 20.5
- Account Ledger table (F0911), 2.2.1, 6.7, 20.5, A.4.7
- Account Master table (F0901), 2.2.2, 6.7.1
- additional system information, 7.2.4
- Address Book Master table (F0101), 2.2.2, 6.7.1
- Address Book Revision form, 4.6.3
- Address Book Revisions program (P01012), 4.6.3
- analyses, 23.3.1
- Asset Account Balances table (F1202), 2.2.1, 5.2, 6.7, 15.10.1, 19.1.4, 20.5, 25.3.8, A.4.7
- asset information - updating, 26.3
- Asset Master table (F1201), 2.2.1, 6.7, A.5.1, A.5.7
- Associated Service Types form, 15.6.3
- automatic accounting instructions
-
- FA range, 6.3.9.7
- FMA, FMB, FMF, FMG, FMH, and AT00, 8.1.2
- FMC, FMD, FME, FMI, FMJ, and FMK, 8.1.3
- FMJE, 6.3.9.6
- FTC range, 6.3.9.3
- FTC1 through FTC0 ranges, 6.3.9.4
- FTD range, 6.3.9.2
- FTxx ranges, 6.3.9.5
- FX range, 19.1
- FX range of accounts, 5.2
- preventive maintenance, 8.1, 8.1.1
- setting up for equipment billing, 6.3.9
- setting up for preventive maintenance, 8.1
- setting up for work orders, 9.2
- Automatic Accounting Instructions Master table (F0012), 2.2.2, 6.7.1
- available quantity, 7.1.2, 7.1.2
B
- Batch Type program (P0011), 25.4.7
- Batches program (P0091), 20.4.1
- Bill of Material Master table (F3002), 2.2.2, A.5.1
- Bill of Material Revisions program (P3002), 16.4.5
- Bill of Material Where Used program (P30201)
-
- processing options, 22.7.3
- usage, 22.7.1
- billable days setup, 6.11
- Billing Rate Code Setup program (P13901), 6.8.1
- branch/plant constants setup, 7.3.5
- Budget to Actual report (R13418)
-
- processing options, A.5.6
- usage, A.5.5
- Budget to Actual Variance program (P48218), 19.3.1.5
- Business Interface Integration Objects, 1.5
C
- CAM - Manage Equipment Work Orders program (P13714), 17.5.7
- CAM - Manage Work Order Labor program (P13732), 17.8.6
- CAM - Manage Work Order Parts program (P13730), 17.6.5
- CAMcapital asset management, 1.2
- capacity load, 22.10.1, 22.10.4, 22.10.6, 22.11.1
- Capacity Load program (P3313), 22.10.3
- Capacity Load table (F3313), A.7.1
- Capacity Message Summary program (P3301), 22.9.6
- Capacity Message table (F3311), A.7.1
- Capacity Planning Message Revisions program (P3311), 22.9.8
- Capacity Requirements and Messages report (R3350)
-
- processing options, A.7.2
- usage, A.7.1
- capacity requirements planning, 9.4
- capital asset management
-
- features, 2.1
- overview, 1.1
- process flow, 1.2
- reports available, 2.1.3
- tables, 2.2
- Case Entry program (P17501E), 24.4.6
- case management, 2.1.4
- Category Code Analysis program (P13CCA), 19.3.1.3
- category codes, 7.2.5
-
- description, 2.1.1
- reviewing work orders, 19.3.1.3
- CBMcondition-based maintenance, 2.1.5
- commitments, 7.1.3
- common elements, 14.2, 15.4, 17.4
- Component Changeout form, 18.7.3
- component change-out parent and component relationships, 18.7
- Component Changeout program (P17STAT), 18.7.1
- Component Item Substitutions form, 17.7.6
- condition-based maintenance, 2.1.5
- constants
-
- branch/plant, 7.3.5
- manufacturing, 10.4
- planning, 10.4
- service and warranty, 4.3.1
- conversion programs, 26.8
- Copy by Item form, 17.8.4
- cost and account information, 16.4.6
-
- for work centers, 16.4.6
- reviewing shop costs, 19.2
- cost reports, A.2.2
- Create Equipment Master Extension Tables form, 12.3.2
- Create Equipment Master Extension Tables program (P17021)
-
- processing options, 12.3.3
- usage, 12.3
- cross-references for parts, 22.8
- CRPcapacity requirements planning, 9.4
- Customer Information Revisions form, 4.6.4
- customers
-
- adding SWM information, 4.6.4
- revising history, 13.4
- revising information, 13.4.1
- setting up, 4.6
D
- data purge and archival, 26.9
- Default Accounting Constants table (F12002), 2.2.2, 6.7.1
- Default Depreciation Constants table (F12003), 2.2.2, 6.7.1
- Default Location & Approval form, 9.8.3
- Default Location and Printers program (P400951), 9.8.3
- default locations
-
- setting up, 9.8
- understanding, 9.8.1
- Default Print Queues form, 9.8.4
- Default Print Queues program (P40096), 9.8.4
- default printers
-
- setting up, 9.8
- understanding, 9.8.1
E
- Employee Transaction History table (F0618), 26.5.1
- Enter Bill of Material Information form, 16.4.5
- Enter Routing Information form, 16.4.10
- EPLequipment parts list, 13.6
- equipment
-
- accounting structure, 19.1.4
- adding master extension records, 26.7.1
- costing, 19.1
- creating a preventive maintenance schedule, 15.5
- creating master records manually, 12.2
- creating messages from role-based workspaces, 24.2.8
- creating records from fixed assets, 12.3
- entering specification information, 13.5
- entering time billing information, 25.3.5
- exchanging, 18.7.1
- identifying, 2.1.1
- information, 4.1.1
- journal entry cost chart, 19.1.4
- locating records, 13.2
- location billing, 25.2
- message logs, 2.1.1
- printing reports, A.2.1
- reports, A.2.1
- searching for information, 2.1.1
- searching for records, 13.2
- searching for records from role-based workspaces, 24.2.2
- setting up, 5.1
- setting up distribution rules, 6.12
- setting up next numbers, 4.4.1
- tables, 2.1.1, 12.2.1
- time billing, 25.1
- tracking equipment status, 13.3
- tracking locations, 2.1.2, 6.4.2
- updating numbers, 26.2
- using time entry, 25.3.2
- viewing detail information from role-based workspaces, 24.2.4
- viewing PM backlog from role-based workspaces, 24.2.10
- viewing specification data from role-based workspaces, 24.2.12
- viewing status history from role-based workspaces, 24.2.6
- Equipment Analysis Costs table (F1383), 2.2.2
- Equipment Analysis Filters table (F1381), 2.2.2
- Equipment Analysis Groups table (F1380), 2.2.2
- Equipment Analysis Listing table (F1382), 2.2.2
- Equipment Analysis Rules table (F1385), 2.2.2
- equipment billing
-
- automatic accounting instructions, 6.3.9
- charging for use, 6.5
- cost accounting, 6.5.2
- integrations, 6.2
- reporting, 6.5.3
- searching for information, 6.4.1
- setting up, 6.3
- setting up billable days, 6.11
- setting up distribution rules, 6.12
- setting up rate code hierarchy, 6.8.1
- setting up rates, 6.9
- setting up rental rules, 6.10
- system flow, 6.6
- tables, 6.7
- time billing, 6.5.1
- understanding, 6.1
- user-defined codes, 6.3.10
- Equipment Billing Rates report (R12426)
-
- processing options, A.4.6
- usage, A.4.5
- Equipment Category Code Mapping table (F1391), 2.2.2, 6.7.1
- equipment cost analysis, 2.1.6
- Equipment Cost Analysis report (R12424)
-
- processing options, A.4.4
- usage, A.4.3
- Equipment Detail program (P1702E)
-
- processing options, 24.2.5
- usage, 24.2.4
- Equipment Distribution Rules program (P1305), 6.12.2
- Equipment Distribution Rules table (F1305), 6.7.1, 6.12
- Equipment History report (R13420)
-
- processing options, A.5.8
- usage, A.5.7
- Equipment License Master table (F1206), 6.7.1
- equipment master
-
- description, 11.2.1
- information, 11.1
- supplemental information, 11.2.2
- types of identification, 11.2
- Equipment Master Address Location Revision program (P1704), 13.4.1
- Equipment Master Extension table (F1217), 2.2.1
- Equipment Master Location History table (F1731), 2.2.1
- Equipment Master Revisions form, 12.2.3
- Equipment Master Revisions program (P1702)
-
- processing options, 12.2.5
- usage, 12.2.3
- Equipment Messages program (P1205E)
-
- processing options, 24.2.9
- usage, 24.2.8
- Equipment Messages table (F1205), 2.2.2, 6.7.1
- equipment parts list
-
- considerations, 13.6.3
- copying, 13.7.1
- creating, 13.6
- understanding, 13.6.1
- equipment parts list
-
- running the batch update, 13.8
- understanding the batch update, 13.8.1
- Equipment Parts List Batch Update program (R13808)
-
- processing options, 13.8.2
- usage, 13.8
- Equipment Parts List Detail form, 13.6.4
- Equipment Parts List program (P13017)
-
- processing options, 13.6.5
- usage, 13.6, 13.7.1
- Equipment Parts List report (R13410)
-
- processing options, A.5.2
- usage, A.5.1
- Equipment Parts List table (F13017), 2.2.2
- Equipment PM Backlog program (P12071E)
-
- processing options, 24.2.11
- usage, 24.2.10
- Equipment PM Schedule form, 15.5.4
- Equipment PM Schedule (Model) table (F12071), 2.2.2
- Equipment PM Schedule program (P1207), 15.8.3
- Equipment Rate Code Definition table (F1390), 6.7.1
- Equipment Rates program (P1301), 6.9.2
- equipment rates setup, 6.9
- Equipment Rates table (F1301), 6.7.1
- Equipment Routes table (F1308), 2.2.2
- Equipment Search program (P1701E)
-
- processing options, 24.2.3
- usage, 24.2.1
- equipment status
-
- tracking, 13.3
- understanding, 13.3.1
- Equipment Time Entry form, 25.3.5
- Equipment Time Entry program (P12110)
-
- processing options, 25.3.4
- usage, 25.3.5
- Equipment Variance report (R13400)
-
- processing options, A.4.8
- usage, A.4.7
- extension records
-
- adding equipment master, 26.7.1
- adding work order, 26.7.2
- overview, 26.7
F
- F0005 table, 2.2.2, 6.7.1
- F00090 table, 2.2.2
- F00091 table, 2.2.2
- F00092 table, 2.2.2, 6.7.1
- F0012 table, 2.2.2, 6.7.1
- F0101 table, 2.2.2, 6.7.1
- F0618 table, 26.5.1
- F0901 table, 2.2.2, 6.7.1
- F0902 table, 5.2, 19.1.4, 20.5
- F0911 table, 2.2.1, 6.7, 20.5, A.4.7
- F12002 table, 2.2.2, 6.7.1
- F12003 table, 2.2.2, 6.7.1
- F1201 table, 2.2.1, 6.7, A.5.1, A.5.7
- F1202 table, 2.2.1, 5.2, 6.7, 15.10.1, 15.10.4, 19.1.4, 20.5, 25.3.8, A.4.7
- F1204 table, 2.2.1, 6.7, A.3.5
- F1205 table, 2.2.2, 6.7.1
- F1206 table, 2.2.2, 6.7.1
- F1207 table, 2.2.1, 26.6.2
- F12071 table, 2.2.2
- F1210 table, 2.2.2, 6.7.1, A.3.5
- F1212 table, 2.2.2, 6.7.1
- F1215 table, 2.2.2, 6.7.1
- F1216 table, 2.2.2, 6.7.1
- F1217 table, 2.2.1
- F1301 table, 6.7.1
- F13017 table, 2.2.2
- F1305 table, 6.7.1, 6.12
- F1306 table, 2.2.2
- F1307 table, 2.2.2, 6.7.1
- F1308 table, 2.2.2
- F13411 table, 2.2.2, 22.2.1, 22.3.1, A.6.1
- F1380 table, 2.2.2
- F1381 table, 2.2.2
- F1382 table, 2.2.2
- F1383 table, 2.2.2
- F1385 table, 2.2.2
- F1390 table, 6.7.1
- F1391 table, 2.2.2, 6.7.1
- F1393 table, 2.2.2
- F1731 table, 2.2.1
- F30006 table, A.7.1
- F3002 table, 2.2.2, A.5.1
- F3003 table, 2.2.2
- F3111 table, 2.2.2
- F3112 table, 2.2.2, 26.5.1
- F3311 table, A.7.1
- F3313 table, A.7.1
- F3405 table, A.6.3
- F3411 table, A.6.3
- F3413 table, A.6.3
- F3460 table, 2.2.2, 22.2.1, 22.3.1
- F4101 table, A.5.1
- F48002 table, 2.2.2
- F4801 table, 2.2.1, 17.9, 26.5.1, A.5.7
- F4802 table, 2.2.2
- F4826 table, 2.2.2
- F4827 table, 2.2.2
- F4829 table, A.5.3
- F48301 table, 2.2.2
- F48302 table, 2.2.2
- F48307 table, 2.2.2
- F48310 table, 2.2.2
- F48311 table, 2.2.2
- F48315 table, 2.2.2
- F48316 table, 2.2.2
- failure analysis
-
- defining tree names, 23.2.6
- overview, 23.1
- setting up, 23.2, 23.2.1
- setting up analyses, 23.3
- setting up analyses by code, 23.3.4
- setting up analyses by tree, 23.3.5
- setting up codes, 23.2.5
- setting up constants, 23.2.3
- setting up failures, 23.3
- setting up failures by code, 23.3.4
- setting up failures by tree, 23.3.5
- setting up resolutions, 23.3
- setting up resolutions by code, 23.3.4
- setting up resolutions by tree, 23.3.5
- setting up sequences, 23.2.8
- setting up tree structure, 23.2.7
- user-defined codes, 4.2.3
- working with transactions, 23.4
- Failure Analysis Codes program (P17761), 23.2.4
- Failure Analysis Tree Names program (P17762), 23.3.6
- failures, 23.3.1
- family and model combinationsproduct family and model combinations, 4.5
- fixed assets - creating equipment records, 12.3
- Forecast Consumption Periods table (F3405), A.6.3
- Forecast File table (F3460), 2.2.2, 22.2.1, 22.3.1
- Freeze Work Center Rates program (R30860), 16.4.8
- frozen costs
-
- updating for work centers, 16.4.7
- frozen costs for work centers, 16.4.2
G
- general accounting integration, 19.1
- general ledger
-
- integration with equipment, 5.2
- posting inventory issues, 20.5
- reviewing work order transactions, 19.3.1.1
- General Ledger Post program (R09801), 20.5, 25.3.7
- Global PM Schedule program (P13075), 26.6.2, 26.6.3
- global updates
-
- asset information, 26.3
- equipment numbers, 26.2
- preventive maintenance schedule information, 26.6, 26.6.2, 26.6.3
- standard parts lists, 26.5.4
- work order actual amounts, 26.5.1
- work order information, 26.5
- work order status based on purchase orders, 26.5.2
H
- history
-
- reviewing status, 18.6
- revising owner and site, 13.4
- tracking equipment status, 13.3
I
- IGSintelligent graphic solution, 1.3.15
- implementation steps
-
- capital asset management, 1.4.2
- global, 1.4
- Integration, 1.5
- integrations, 1.3
- intelligent graphic solution, 1.3.15
-
- integrating, 3.3
- overview, 3.1
- work order parts, 3.3.2, 3.3.3
- inventory
-
- assigning category codes, 7.2.5
- available quantity, 7.1.2
- branch/plant constants, 7.3.5
- commitments, 7.1.3
- commitments graphic, 7.1.3
- entering additional system information, 7.2.4
- entering item branch information, 7.2.3
- entering item master records, 7.2.2
- item master, 7.2
- line types, 7.3.1
- on-hand quantity, 7.1.2
- overview, 7.1
- reviewing issues, 20.4
- selecting parts for work orders, 17.7.1
- setting up, 7.3
- setting up items, 7.2
- stocking type codes, 7.3.2
- stocking types, 7.1.1
- supply and demand quantities, 7.1.4
- Inventory Issue Revisions form, 20.2.4
- Inventory Issues program (P4112)
-
- processing options, 20.3.4
- usage, 20.3.1
- item branch information, 7.2.3
- Item Cross Reference program (P4104), 22.8.3
- item master records, 7.2.2
- Item Master table (F4101), A.5.1
J
- journal entries
-
- equipment cost flow, 5.3
- processing, 21.4
- purging, 25.4.9
- reviewing inventory issues, 20.4
- types that affect equipment costs chart, 19.1.4
L
- labor
-
- assigning to work orders, 17.8
- generating plans, 22.9.2
- instructions, 17.8.1
- plan generation messages, 22.9.2
- planning reports, A.2.5
- printing planning reports, A.2.5
- reviewing capacity load, 22.10
- reviewing capacity load by period summary, 22.10.6
- reviewing capacity load by work center, 22.10.4
- reviewing messages by dispatch group, 22.9.7
- reviewing messages by work center, 22.9.9
- reviewing work order costs, 19.3.1.5
- revising resource units for a work center, 22.12
- revising resources, 22.11
- revising work order dates, 22.11.1
- setting up critical work centers, 22.9.2
- understanding forms and messages, 22.9.1
- understanding plans, 22.9.1
- working with plans, 22.9
- licenses and certifications, 2.1.1
- line types, 7.3.1
- location billing
-
- account distribution, 6.12
- approving a batch, 25.4.6
- creating, 25.4.4
- excluding non-billable locations, 25.4.4.3
- posting, 25.4.8
- process flow, 25.4.1
- rate groups, 25.2
- rate tables, 25.2
- rental rules, 25.2
- reviewing, 25.4.5
- revising, 25.4.9
- understanding, 25.2
- verifying, 25.4.4.1
- Location Billing Inquiry program (P13200), 25.4.5
- Location Billings program (R1304), 25.4.3
- Location History Text table (F1210), 2.2.2, 6.7.1, A.3.5
- Location Information report (R12460)
-
- processing options, A.3.6
- usage, A.3.5
- Location Tracking table (F1204), 2.2.1, 6.7, A.3.5
- locations, searching, 2.1.1
M
- maintenance costing
-
- accounting structure, 19.1.4
- explaining cost types, 19.1.4
- issuing miscellaneous parts to work orders, 20.3
- issuing parts to a work order, 20.1, 20.2
- overview, 5.2
- posting inventory issues, 20.5
- reviewing by cost account, 19.2
- reviewing costs by parent work order, 19.3.1.4
- reviewing estimated and actual work order amounts, 19.3.1.5
- reviewing inventory issues, 20.4
- reviewing summarized work order costs, 19.3.1.2
- reviewing work order costs, 19.3
- reviewing work order costs by category code, 19.3.1.3
- reviewing work order transactions, 19.3.1.1
- maintenance planning, 4.1.5
-
- generating a parts plan, 22.4
- reports, A.2.4
- reviewing PM projections, 22.3
- setting up general information, 10.1
- supply and demand inclusion rules, 9.4, 10.3
- understanding, 22.1
- understanding PM projections, 22.3.1
- Maintenance Reschedule Metrics table (F48316), 2.2.2
- maintenance routes
-
- creating, 15.7
- using logical equipment, 15.7.1
- using phantom equipment, 15.7.1
- using virtual equipment, 15.7.1
- maintenance rules
-
- assigning work orders, 8.2.2
- calculating projected start dates, 8.2.2.2
- searching for, 8.2.2.1
- setting up, 8.2.2
- Maintenance Rules program (P1393), 8.2.5
- Maintenance Rules table (F1393), 2.2.2
- Maintenance Schedule File table (F1207), 2.2.1
- Maintenance Schedule Metrics tables (F48315), 2.2.2
- Maintenance Schedule Periods table (F48302), 2.2.2
- Maintenance Schedule table (F1207), 26.6.2
- Manufacturing Constants program (P3009), 10.4.2
- Manufacturing Constants Revision form, 10.4.2
- manufacturing constants setup, 10.4
- material requirements planning
-
- forecasts, 2.2.2
- supply and demand inclusion rules, 9.4
- MBFtimeentry master business function, 21.3.3
- message logs, 11.2.4
- Message Summary program (P3401), 22.4.5
- meter estimates
-
- overview, 14.6
- setting up, 14.6.1
- Meter Estimates form, 14.6.4
- Meter Reading Estimates program (P1306)
-
- processing options, 14.6.3
- usage, 14.6.1
- Meter Reading Estimates table (F1306), 2.2.2
- meter reading interoperability, 4.2.4
- meter readings
-
- creating equipment templates, 14.5
- entering, 14.3
- entering for a piece of equipment, 14.3.5
- entering speed, 14.4
- original and lifetime, 15.10.1
- overview of meter estimatesmeter estimates, 14.6
- reviewing, 14.7
- revising, 14.7
- understanding, 14.1
- understanding speed, 14.4.1
- updating estimates, 14.6.5
- viewing from role-based workspaces, 24.2.13
- Meter Readings form, 14.3.5
- Meter Readings program (P12120), 15.10.1
-
- processing options, 14.3.4
- usage, 14.3.1
- Meter Readings program (P12120E)
-
- processing options, 24.2.14
- usage, 24.2.13
- Mobile Applications for Health and Safety, 9.1.4, 12.1.1, 13.1.1
- Mobile Applications for Incident Management, 17.2.2, 18.11.2, 24.4.3
- Mobile Applications for Meter Reading for Equipment, 24.1.1
- Mobile Applications for Speed Meter Reading, 14.1.1
- Mobility, 9.1.4, 12.1.1, 13.1.1, 14.1.1, 17.2.2, 18.11.2, 24.1.1, 24.4.3
- model and family combinationsproductfamily and model combinations, 4.5
- model schedules
-
- creating, 15.8.1
- preventive maintenance, 15.8
- model time entry, 25.3.6
- model work orders
-
- creating, 16.1
- for unscheduled maintenance, 17.10.1
- setting up parts lists and instructions, 16.4.1
- MPS/MRP/DRP Message table (F3411), A.6.3
- MPS/MRP/DRP Summary table (F3413), A.6.3
- MRPmaterial requirements planning, 9.4
- MRPmaterial requirementsplanning, 2.2.2
- MRP/MPS Detail Message Revisions program (P3411), 22.5.3
- MRP/MPS Requirements Planning program (R3482), 22.4
N
- next numbers
-
- setting up for equipment, 4.4.1
- setting up for work orders, 9.6
- Next Numbers program (P0002), 4.4.3
O
- on-hand quantity, 7.1.2
- Operation Dispatch Inquiry (P31220), 22.11.3
- order line typesline types, 7.3.1
- overviews
-
- capital asset management, 1.1
P
- P0002 program, 4.4.3
- P0011 program, 25.4.7
- P0091 program, 20.4.1
- P01012 program, 4.6.3
- P050002A program, 21.3.3
- P09210A program, 19.2.3
- P1205E program
-
- processing options, 24.2.9
- usage, 24.2.8
- P1207 program, 15.8.3
- P12071 program
-
- processing options, 15.10.4
- usage, 15.10.1
- P12071E program
-
- processing options, 24.2.11
- usage, 24.2.10
- P12110 program
-
- processing options, 25.3.4
- usage, 25.3.5
- P12120 program, 15.10.1
-
- processing options, 14.3.4
- usage, 14.3.1
- P12120E program
-
- processing options, 24.2.14
- usage, 24.2.13
- P12120U program
-
- processing options, 14.4.3
- usage, 14.4
- P1215 program, 5.4.4
- P1301 program, 6.9.2
- P13017 program
-
- processing options, 13.6.5
- usage, 13.6, 13.7.1
- P1302 program, 6.10, 6.11.2
- P1305 program, 6.12.2
- P1306 program
-
- processing options, 14.6.3
- usage, 14.6.1
- P1307 program
-
- processing options, 13.3.4, 18.6.3
- usage, 13.3.1
- P13075 program, 26.6.2, 26.6.3
- P1307E program
-
- processing options, 24.2.7
- usage, 24.2.6
- P13200 program, 25.4.5
- P13220 program, 18.3.3
- P134310E program
-
- processing options, 24.3.11
- usage, 24.3.10
- P13700 program
-
- processing options, 17.5.6
- usage, 17.5.2
- P13714 program, 17.5.7
- P13730 program, 17.6.5
- P13732 program, 17.8.6
- P13901 program, 6.8.1
- P1393 program, 8.2.5
- P13CCA program, 19.3.1.3
- P17001 program, 4.3.3, 9.5.2, 23.2.3
- P1701 program
-
- processing options, 12.2.4
- usage, 13.1
- P1701E program
-
- processing options, 24.2.3
- usage, 24.2.1
- P1702 program
-
- processing options, 12.2.5
- usage, 12.2.3
- P17021 program
-
- processing options, 12.3.3
- usage, 12.3
- P1702E program
-
- processing options, 24.2.5
- usage, 24.2.4
- P1704 program, 13.4.1
- P17500E program, 24.4.4
- P17501E program, 24.4.6
- P17714 program, 17.9.5
- P17714E program
-
- processing options, 24.3.6
- usage, 24.3.5
- P17715 program
-
- processing options, 9.7.3
- usage, 9.7
- P17730 program, 17.6.6
- P17732 program, 17.8.7
- P17761 program, 23.2.4
- P17762 program, 23.3.6
- P17766 program, 23.3.3
- P1790 program, 4.5.3
- P17STAT program, 18.7.1
- P3002 program, 16.4.5
- P3003 program, 16.4.9, 16.4.10
- P3006 program, 10.7.4, 10.7.5, 16.4.6
- P3009 program, 10.4.2
- P30201 program
-
- processing options, 22.7.3
- usage, 22.7.1
- P3121 program, 18.8.4
- P31220 program, 22.11.3
- P3301 program, 22.9.6
- P3311 program, 22.9.8
- P3312 program, 22.10.5
- P3313 program, 22.10.3
- P3401 program, 22.4.5
- P3411 program, 22.5.3
- P400951 program, 9.8.3
- P40096 program, 9.8.4
- P4104 program, 22.8.3
- P4112 program
-
- processing options, 20.3.4
- usage, 20.3.1
- P48201 program, 18.10.1
- P48201E program
-
- processing options, 24.3.4
- usage, 24.3.3
- P48218 program, 19.3.1.5
- P48331E program
-
- processing options, 24.3.9
- usage, 24.3.8
- parent and component relationships
-
- description, 2.1.1
- swapping components, 18.7
- Parent History table (F1212), 2.2.2, 6.7.1
- pareto analysis, 23.1
- parts
-
- assigning to work orders, 17.7
- generating a plan, 22.4
- integration with maintenance planning, 22.4.1
- issuing miscellaneous parts to work orders, 20.3
- issuing to work orders, 20.1, 20.2
- planning horizons, 22.4.1
- planning messages, 22.4.1
- posting inventory issues, 20.5
- purchasing for work orders, 18.9
- reviewing, 18.8.1
- reviewing by planning family, 22.4.6
- reviewing inventory issues, 20.4
- reviewing parent information for component parts, 22.7
- reviewing plans, 22.4.1
- reviewing supply and demand, 22.6
- reviewing work order costs, 19.3.1.5
- updating standard parts lists, 26.5.4
- updating work order status based on parts received, 26.5.2
- working with cross-references, 22.8
- working with detail messages, 22.5, 22.5.1
- parts list
-
- overview of standard, 16.4.1
- setting up standard, 16.4, 16.4.1.4
- Parts List Detail Inquiry form, 18.8.3
- parts planning user-defined codes, 10.5.1
- payroll - processing journal entries, 21.4
- period summary - reviewing capacity load, 22.10.6
- Period Summary program (P3312), 22.10.5
- Period Summary report (R3352)
-
- processing options, A.7.4
- usage, A.7.3
- planning constants setup, 10.4
- planning workbench, 17.5.2
- Planning Workbench program (P13700)
-
- processing options, 17.5.6
- usage, 17.5.2
- PM Backlog form, 15.10.3
- PM Projections table (F13411), 2.2.2, 22.2.1, 22.3.1, A.6.1
- PMpreventive maintenance, 4.1.3
- Post G/L Entries to Assets program (R12800), 25.3.8
- preventive maintenance
-
- automatic accounting instructions, 8.1
- changing status to complete, 15.10
- completing, 15.1.8
- creating a maintenance route, 15.7
- creating model schedules, 15.8.1
- creating multiple schedules, 26.6.3
- creating schedules, 15.1.6, 15.5
- creating schedules for multiple pieces of equipment, 26.6.3
- cycles, 15.1
- explaining schedules, 15.1.3
- explaining status, 15.1.4
- explanation, 15.1.2
- information, 4.1.3
- linking service types, 15.6
- models, 15.8
- overview of major processes, 15.1.5
- printing reports, A.2.6
- process flow, 15.3
- reports, A.2.6, A.8.1
- reviewing projections, 22.3
- revising service types, 26.6.2
- running the PM Projection Batch Update, 22.2.1
- scheduling, 15.1.7
- service types, 15.1.1
- setting up cycles, 8.2.1
- setting up maintenance rulesmaintenance rules, 8.2.2
- setting up rules for schedules, 8.2
- setting up schedule information, 8.2.1
- setting up standard procedures, 8.2.1.1
- setting up threshold percentages, 8.2.2
- typical maintenance cycle chart, 15.2
- understanding projections, 22.3.1
- understanding schedules, 8.2.1
- updating projections, 22.2
- updating schedule information, 26.6, 26.6.2
- updating schedule status information, 15.9
- user-defined codes, 4.2.1
- Preventive Maintenance Backlog program (P12071)
-
- processing options, 15.10.4
- usage, 15.10.1
- Print Equipment Message Log report (R12450)
-
- processing options, A.8.4
- usage, A.8.3
- Print Frequency of Occurrence report (R13419)
-
- processing options, A.8.6
- usage, A.8.5
- Print Labor Utilization report (R13440)
-
- processing options, A.5.11
- usage, A.5.10
- Print Maintenance Schedule report (R12407)
-
- processing options, A.8.2
- usage, A.8.1
- Print Master Production Schedule report (R3450)
-
- processing options, A.6.4
- usage, A.6.3
- Print Parts Forecast report (R13450)
-
- processing options, A.5.13
- usage, A.5.12
- Print PM Projections report (R13412)
-
- processing options, A.6.2
- usage, A.6.1
- process flow - capital asset management, 1.2
- procurement
-
- overview, 7.3
- parts for work orders, 18.9
- product family and model combinations setup, 4.5
- Product Family/Model Revisions form, 4.5.3
- Product Family/Model Revisions program (P1790), 4.5.3
- projected start dates calculation, 8.2.2.2
- Property and Equipment License Master table (F1206), 2.2.2
- purchase orders, 18.9, 26.5.2
- purchase orders - viewing related from role-based workspaces, 24.3.10
R
- R09801 program, 20.5, 25.3.7
- R12310 report
-
- processing options, A.4.2
- usage, A.4.1
- R12400 report
-
- processing options, A.3.2
- usage, A.3.1
- R12407 report
-
- processing options, A.8.2
- usage, A.8.1
- R12424 report
-
- processing options, A.4.4
- usage, A.4.3
- R12426 report
-
- processing options, A.4.6
- usage, A.4.5
- R12440 report
-
- processing options, A.3.4
- usage, A.3.3
- R12450 report
-
- processing options, A.8.4
- usage, A.8.3
- R12460 report
-
- processing options, A.3.6
- usage, A.3.5
- R12800 program, 25.3.8
- R12807 program
-
- processing options, 15.9.3
- usage, 15.9
- R1304 program, 25.4.3
- R13400 report
-
- processing options, A.4.8
- usage, A.4.7
- R13410 report
-
- processing options, A.5.2
- usage, A.5.1
- R13411 program
-
- processing options, 22.2.3
- usage, 22.2.1
- R13412 report
-
- processing options, A.6.2
- usage, A.6.1
- R13415 report
-
- processing options, A.5.4
- usage, A.5.3
- R13418 report
-
- processing options, A.5.6
- usage, A.5.5
- R13419 report
-
- processing options, A.8.6
- usage, A.8.5
- R13420 report
-
- processing options, A.5.8
- usage, A.5.7
- R13430 report, A.5.9
- R13440 report
-
- processing options, A.5.11
- usage, A.5.10
- R13450 report
-
- processing options, A.5.13
- usage, A.5.12
- R13800 program, 26.5.1
- R13802 program
-
- processing options, 26.5.5
- usage, 26.5.4
- R13806 program
-
- processing options, 14.6.6
- usage, 14.6.5
- R13808 program
-
- processing options, 13.8.2
- usage, 13.8
- R3007G program
-
- processing options, 10.8.3
- running, 10.8.2
- usage, 10.8.1
- R30860 program, 16.4.8
- R3350 report
-
- processing options, A.7.2
- usage, A.7.1
- R3352 report
-
- processing options, A.7.4
- usage, A.7.3
- R3450 report
-
- processing options, A.6.4
- usage, A.6.3
- R3482 program, 22.4
- R4801P program, 26.9
- R48810 program
-
- processing options, 26.5.3
- usage, 26.5.2
- R8912071B (Update PDFG in F12071 for 8.10), 26.8.2
- R891207B (Update PDFG in F1207 for 8.10), 26.8.1
- rate code hierarchy setup, 6.8.1
- record types, 9.3
- Related Purchase Orders program (P134310E)
-
- processing options, 24.3.11
- usage, 24.3.10
- rental rules, 25.2
-
- setting up, 6.10
- Rental Rules program (P1302), 6.10, 6.11.2
- reports, 2.1.3, A.1
- resolutions, 23.3.1
- Resource Assignment Constants table (F48301), 2.2.2
- resource assignments
-
- overview, 2.1.7
- viewing from role-based workspaces, 24.3.8
- Resource Assignments program (P48331E)
-
- processing options, 24.3.9
- usage, 24.3.8
- Resource Assignments table (F48311), 2.2.2
- Resource Master table (F48310), 2.2.2
- resource planning
-
- setting up, 10.6
- setting up resource units, 10.6.2
- understanding, 10.6.1
- user-defined codes, 10.2
- resource units
-
- calculating availability, 10.8
- revising for work centers, 22.12
- setting up, 10.6.2
- Resource Working Hours table (F48307), 2.2.2
- Review Team Work Orders, 24.3.2
- role-based workspaces
-
- creating and updating cases, 24.4.5
- creating equipment messages, 24.2.8
- managing cases, 24.4.1
- managing equipment, 24.2.1
- managing work orders, 24.3.1
- printing work orders, 24.3.7
- searching for equipment, 24.2.2
- understanding, 24.1
- viewing cases, 24.4.2
- viewing equipment information detail, 24.2.4
- viewing equipment PM backlog, 24.2.10
- viewing equipment specification data, 24.2.12
- viewing equipment status history, 24.2.6
- viewing meter readings, 24.2.13
- viewing related purchase orders, 24.3.10
- viewing resource assignments, 24.3.8
- viewing work orders, 24.3.3
- viewing work orders detail information, 24.3.5
- Routing Master File table (F3003), 2.2.2
S
- Self Service form
- Service Provider Revisions form, 4.6.6
- service providers
-
- adding SWM information, 4.6.6
- setting up, 4.6
- service types
-
- linking, 15.6
- overview, 15.1.1
- Set Up Next Numbers by System form, 4.4.3, 9.6.2
- setup
-
- equipment, 5.1
- failure analysis, 23.2.1
- inventory, 7.3
- planning information, 10.1
- procurement, 7.3
- system constants, 23.2.3
- work orders, 9.1
- shop costs by cost account, 19.2
- site
-
- revising history, 13.4
- revising information, 13.4.1
- Specification Cross Reference program (P1215), 5.4.4
- Specification Cross Reference Revisions form, 5.4.4
- Specification Cross Reference table (F1215), 2.2.2, 6.7.1
- specification data
-
- setting up, 5.4.4
- Specification Data table (F1216), 2.2.2, 6.7.1
- specification information
-
- description, 11.2.3
- entering, 13.5
- setting up, 5.4
- understanding, 13.5.1
- speed meter readings, 14.4
- Speed Meter Readings form, 14.4.4
- Speed Meter Readings program (P12120U)
-
- processing options, 14.4.3
- usage, 14.4
- Speed Time Entry Revisions form, 21.3.2
- Standard Parts List Update program (R13802)
-
- processing options, 26.5.5
- usage, 26.5.4
- Standard Work Order Instructions program (P3003), 16.4.9
- status
-
- changing to complete, 15.10
- reviewing history of work orders, 18.6
- Status History program (P1307)
-
- processing options, 13.3.4, 18.6.3
- usage, 13.3.1
- Status History program (P1307E)
-
- processing options, 24.2.7
- usage, 24.2.6
- Status History table (F1307), 2.2.2, 6.7.1
- stocking types
-
- defining, 7.1.1
- setting up codes, 7.3.2
- substitute parts, 22.8
- supplemental data
-
- cross-references, 5.5.1.1
- defining data types, 5.5.1
- defining names and database code, 5.5.1
- description, 11.2.2
- information, 4.1.2
- setting up, 5.5
- setting up cross-references, 5.5.4
- Supplemental Data by Asset report (R12400)
-
- processing options, A.3.2
- usage, A.3.1
- Supplemental Data by Type report (R12440)
-
- processing options, A.3.4
- usage, A.3.3
- Supplemental Data table (F00092), 2.2.2, 6.7.1
- Supplemental Database Data Types table (F00091), 2.2.2
- Supplemental Database Setup table (F00090), 2.2.2
- supply and demand
-
- explaining, 7.1.4
- reviewing for maintenance parts, 22.6
- searching for inclusion rules, 9.4
- setting up inclusion rules, 9.4, 10.3
- SWM System Constants Revisions form, 4.3.3, 9.5.2
- SWM System Constants Revisions program (P17001), 4.3.3, 9.5.2, 23.2.3
- system
-
- equipment cost integration, 5.2
- setting up constants, 4.3.1
- setting up constantsservice orders, 9.5
- setup, 4.1
T
- threshold percentages
-
- describing, 15.6.1
- setting up, 8.2.2
- time billing
-
- entering charges using equipment, 25.3.2
- entering information, 25.3.5
- posting general ledger entries to equipment, 25.3.8
- posting to the general ledger, 25.3.7
- understanding, 25.1
- using model time entry, 25.3.6
- time entry
-
- entering for employees, 21.3
- Time Entry Journal report (R12310)
-
- processing options, A.4.2
- usage, A.4.1
- time entry master business function
-
- considerations, 21.3.3.1
- setting up, 21.3.3
- Time Entry MBF program (P050002A), 21.3.3
- tree structure, 23.2.6
- Trial Balance/Ledger Comparison program (P09210A), 19.2.3
U
- UDCsuser-defined codes, 4.2.1
- unscheduled maintenance - creating work orders, 17.10
- Update Meter Estimates program (R13806)
-
- processing options, 14.6.6
- usage, 14.6.5
- Update PDFG in F1207 for 8.10 (R891207B), 26.8.1
- Update PDFG in F12071 for 8.10 (R8912071B), 26.8.2
- Update PM Projections program (R13411)
-
- processing options, 22.2.3
- usage, 22.2.1
- Update PM Schedule Status program (R12807)
-
- processing options, 15.9.3
- usage, 15.9
- Update W.O. Actual Amounts program (R13800), 26.5.1
- Update WO Status Based on PO Receipt program (R48810)
-
- processing options, 26.5.3
- usage, 26.5.2
- user-defined codes
-
- description, 2.1.1
- equipment billing, 6.3.10
- failure analysis, 4.2.3
- message types, 22.5.1
- meter reading interoperability, 4.2.4
- parts planning, 10.5.1
- preventive maintenance, 4.2.1
- resource planning, 10.2
- setting up, 4.2.1
- work orders, 4.2.2
- User-Defined Codes table (F0005), 2.2.2, 6.7.1
W
- W.O. Status Action table (F4826), 2.2.2
- Work Center Master Revisions form, 10.7.4
- Work Center Master table (F30006), A.7.1
- work center rates, 10.7.1
- Work Center Rates Revisions form, 10.7.5
- Work Center Resource Units Generation program (R3007G)
-
- processing options, 10.8.3
- running, 10.8.2
- usage, 10.8.1
- Work Center Revision program (P3006), 10.7.4, 10.7.5, 16.4.6
- work centers
-
- entering costing and accounting information, 16.4.6
- reviewing capacity load, 22.10.1, 22.10.4
- revising resource units, 22.12
- setting up critical, 22.9.2
- understanding, 10.7.1
- updating frozen costs, 16.4.2
- work day calendar setup, 10.1.1
- Work Order Approval Routing table (F4827), 2.2.2
- Work Order Completion report (R13430), A.5.9
- Work Order Delivery Information table (F4829), A.5.3
- Work Order - Manageform, 17.5.5, 17.6.4, 18.9.4
- Work Order Detail program (P17714E)
-
- processing options, 24.3.6
- usage, 24.3.5
- Work Order Instructions File table (F4802), 2.2.2
- Work Order Labor Detail program (P17732), 17.8.7
- work order life cycle, 9.1
- Work Order Master File table (F4801), 2.2.1
- Work Order Master table (F4801), 17.9, 26.5.1, A.5.7
- Work Order Parts Detail program (P17730), 17.6.6
- Work Order Parts List Inquiry program (P3121), 18.8.4
- Work Order Parts List report (R13415)
-
- processing options, A.5.4
- usage, A.5.3
- Work Order Parts List table (F3111), 2.2.2
- Work Order Purge program (R4801P), 26.9
- Work Order Record Types File table (F48002), 2.2.2
- Work Order Revisions form, 17.9.4
- Work Order Revisions program (P17714), 17.9.5
- Work Order Routing table (F3112), 2.2.2, 26.5.1
- Work Order Search program (P48201E)
-
- processing options, 24.3.4
- usage, 24.3.3
- work orders
-
- adding extension records, 26.7.2
- approvals, 17.2.1
- assigning labor, 17.8
- assigning labor instructions, 17.8.1
- assigning parts, 17.6
- assigning parts from inventory, 17.7
- automatic accounting instructions, 9.2
- creating for unscheduled maintenance, 17.10
- creating using Work Order Entry (P48201 and P17714), 17.9
- creating with planning workbench, 17.5
- entering, 17.5.1, 17.9.1
- exchanging equipment, 18.7.1
- information, 4.1.4
- instructions, 17.8.1
- issuing miscellaneous parts, 20.3
- issuing parts, 20.1, 20.2
- life cycle flow chart, 17.1
- locating, 18.3.1
- overview of instructions, 16.4.1
- posting inventory issues, 20.5
- printing from role-based workspaces, 24.3.7
- purchasing parts, 18.9
- purging, 26.9, 26.9
- reports, A.2.3
- reviewing costs, 19.3
- reviewing costs by category code, 19.3.1.3
- reviewing costs by parent order, 19.3.1.4
- reviewing estimated and actual amounts, 19.3.1.5
- reviewing inventory issues, 20.4
- reviewing parts lists, 18.8.1
- reviewing status history, 18.6
- reviewing summarized costs, 19.3.1.2
- reviewing transactions, 19.3.1.1
- revising, 18.4
- revising dates, 22.11.1
- searching for, 18.3.1
- setting up constants, 9.5
- setting up flow chart, 16.4.1
- setting up for unscheduled maintenance, 17.10
- setting up history, 9.7
- setting up instructions, 16.4
- setting up next numbers, 9.6
- setting up standard instructions, 16.4.1.4
- setting up standard parts list, 16.4.1.4
- swapping components, 18.7
- understanding life cycle, 9.1
- understanding models, 16.1, 17.10.1
- understanding web orders, 18.10.1
- updating actual amounts, 26.5.1
- updating information, 26.5
- updating life cycle information, 18.5
- updating status based on purchase orders, 26.5.2
- user-defined codes, 4.2.2
- viewing detail information from role-based workspaces, 24.3.5
- viewing from role-based workspaces, 24.3.3
- working on the web, 18.10
- work orderswork order life cycle, 4.1.4
- Work with Cases program (P17500E), 24.4.4
- Work with Equipment Master program (P1701)
-
- processing options, 12.2.4
- usage, 13.1
- Work With Equipment Work Orders program (P13220), 18.3.3
- Work With Failure Analysis program (P17766), 23.3.3
- Work with Routing Master program (P3003), 16.4.10
- Work With Unscheduled Maintenance form, 17.10.4
- Work With User-Defined Codes form, 10.5.4
- Work With Work Order History program (P17715)
-
- processing options, 9.7.3
- usage, 9.7
- Work With Work Order Location Search form, 17.7.5
- Work With Work Orders program (P48201), 18.10.1
- workflow
-
- approval process, 17.2.1
- understanding, 17.2
- work order approval process, 17.2.1