Chapter 2 Hardware Installation and Removal
Observing ESD and Handling Precautions
To Verify Proper Installation (Oracle SPARC)
To Verify Attached Storage (Oracle SPARC)
To Verify Proper Installation (Oracle x86)
Replacing the SFP+ Unit on the HBA
The following instructions describe the tasks required to remove the HBA. Refer to your system installation or service manual for detailed HBA removal instructions.
The following steps summarize the hardware removal process:
Halt the operating system and remove power from the system.
Remove the HBA hardware.