Confirming Switch Specifications
Preparing to Install the Switch
Install the Switch in the Rack
Finish the Switch Installation
Connecting to the Service Processor
Oracle ILOM Features Not Supported
Verify the DHCP-Assigned IP Address and Host Name
Configure Network Management From CLI (SER MGT)
Log Into Oracle ILOM Web (NET MGT)
Log Into Oracle ILOM CLI (NET MGT)
Log Into Oracle ILOM CLI (SER MGT)
SER MGT Port Configuration Parameters
Configure Network Management From Web
Configure Network Management From CLI (NET MGT)
Configuring SEFOS User Privileges
Change a SEFOS User Privilege Level
Check Switch Status (Oracle ILOM)
Note - This procedure assumes that you have removed all Ethernet cables from the switch and have powered down both power supplies by removing both power cords.
See:
There are five screws on each side and six screws across the top rear of the cover.
See Install the Battery.