Confirming Switch Specifications
Preparing to Install the Switch
Install the Switch in the Rack
Finish the Switch Installation
Connecting to the Service Processor
Oracle ILOM Features Not Supported
Verify the DHCP-Assigned IP Address and Host Name
Configure Network Management From CLI (SER MGT)
Log Into Oracle ILOM Web (NET MGT)
Log Into Oracle ILOM CLI (NET MGT)
Log Into Oracle ILOM CLI (SER MGT)
SER MGT Port Configuration Parameters
Configure Network Management From Web
Configure Network Management From CLI (NET MGT)
Configuring SEFOS User Privileges
Change a SEFOS User Privilege Level
Check Switch Status (Oracle ILOM)
This procedure describes how to remove the cables from the switch chassis, so that a cable can be replaced. If you are removing all cables for switch replacement, start removing the cables from the left side of the switch, working your way to the right.
For a dual-part QSFP or SFP+ cable assembly, pull the optical cable connector retraction handle and gently pull out the optical cable.
For a single-part passive copper QSFP cable, pull on the retractor strap while simultaneously pulling on the cable connector.
The cable connector comes free.
![]() | Caution - Do not allow the cable to drop or strike the floor. Jerking, bending, pulling on, or dropping the cable can damage the cable. |