After servicing the system, reinstall it into the rack.
Caution - Deploy any rack anti-tilt mechanism before installing the server into the rack. |
Caution - The server weighs approximately 63 pounds (28.5 kg). Two people are required to carry the chassis and install it in the rack. |
Refer to Installing the Storage Server Into a Rack in Oracle Exadata Storage Server X5-2 High Capacity Installation Guide for the installation instructions specific to your rackmount kit.
For installation instructions for the CMA, refer to Install the Cable Management Arm in Oracle Exadata Storage Server X5-2 High Capacity Installation Guide .