Go to main content
Oracle® Fabric Interconnect F2-12 Installation Guide

Exit Print View

Updated: November 2016
 
 

Verify LED Status

  1. Identify the prerequisite and subsequent installation tasks that you must perform in conjunction with this task.

    See Installation Task Overview.

  2. At the switch, observe the state of the various chassis and component LEDs.
  3. Verify that the switch is operating.

    See Verify That the Switch Is Operational.

Related Information