Go to main content

Oracle® Exadata Storage Server X8-2 EF, HC, and XT Service Manual

Exit Print View

Updated: June 2021
 
 

Reinstall the Server Into the Rack

After servicing the system, reinstall it into the rack.


Caution

Caution  -  Deploy any rack anti-tilt mechanisms before installing the server into the rack.



Caution

Caution  -  The EF server weighs approximately 22.8 kg (50.2 lb). The HC and XT servers weigh approximately 30.5 kg (67.1 lb). Two people are required to unmount and carry the chassis.


  1. Lift the server from the antistatic mat, and reinstall the server into the rack.

    For installation instructions for your rackmount kit, refer to Installing the Server Into a Rack in Oracle Servers X8-2 and X8-2L Installation Guide.

  2. If the cable management arm (CMA) is not installed, that is, you removed it because you removed the server completely out of the rack, install the CMA.

    For installation instructions for the CMA, refer to Install the Cable Management Arm (Optional) in Oracle Servers X8-2 and X8-2L Installation Guide.

  3. If the cables are disconnected from the back of the server, that is, you disconnected the cables because you removed the server completely out of the rack, reconnect the cables.

Related Information