Documentation, Support, and Training
Evaluating Product Compatibility
Preparing to Install the Blade Server
Installing Components and Blade Server
Installing Optional Components
Install an Advanced Mezzanine Card
Install an Advanced Rear Transition Module
Software and Firmware Upgrades
Software and Firmware Upgrades
Administering Parameters and Configurations
Administering User Accounts and Security
An IDE CF card can be installed on the blade server for user flash. Due to the location of the CF slot, the blade server must be outside of the chassis for you to install a CF card. The CF is not hot-swappable. The maximum capacity is 32GB.
Take antistatic precautions.
See Safety Requirements.
Access the blade server by performing one of the following procedures:
If the blade server is installed in an ATCA shelf, remove the blade server.
If the blade sever is new and not installed, unpack the blade server.
![]() | Caution - Do not place blade server on top of an antistatic envelope unless the
outside of the envelope also has antistatic properties. For detailed handling instructions and safety
precautions, see |
Locate the CF connector.
The connector is located on the blade server, behind the sheet metal door protecting the AMC slot.
To install the CF card, use the arrow on the card as a guide to insert the card into the CF connector.
Note - CF cards have a life time of 2,000,000 write/erase cycles. Users are responsible for ensuring that the OS and applications do not exceed this maximum.