Skip Navigation Links | |
Exit Print View | |
StorageTek 4 Gb FC Dual Port ExpressModule HBA From Emulex Installation Guide For HBA Models SG-XPCIE2FC-EB4-Z and SG-PCIE2FC-EB4-Z |
HBA Features and Specifications
2. Hardware Installation and Removal
Observing ESD and Handling Precautions
Testing the Installation (Oracle Solaris)
To Verify Proper Installation (Oracle Solaris)
To Verify Attached Storage (Oracle Solaris)
Configuring the HBA for Hot-Plug Operation
Configuring the HBA for Hot-Plug Operation
To Prepare the HBA for Removal Using the HBA Attention Button
To Prepare the HBA for Hot-Plug Removal (for Oracle Solaris)
Driver Software for the Oracle Solaris OS
Oracle Solaris Diagnostic Support
Installing Software for the Red Hat and SUSE Linux OSs
To Install the HBA Software for Linux OS
Installing Software for Windows Server 2003
To Install the Software for Windows Server 2003
Configuration and Diagnostic Utilities
Oracle Solaris 10 for x64/x86 Operating Systems
Red Hat Enterprise Linux 4 and SUSE Linux Enterprise Server 9 Systems
The following instructions describe the tasks required to remove the HBA. Refer to your system installation or service manual for detailed HBA adapter removal instructions.
The hardware removal process involves the following general steps:
Either halting the operating system and removing power from the server blade, or preparing the HBA for hot-plug removal with one of the following:
The HBA Attention button
The Oracle Solaris OS
Removing the HBA hardware
The green Attention LED near the button should blink for approximately five seconds, indicating that the HBA is being prepared for removal.
If you want to abort the operation, press the button again before the LED stops blinking.
If you want to remove the HBA without first halting the operating system and removing power from the associated server blade, you may first prepare it for removal as follows:
Ap_Id Type Receptacle Occupant Condition pcie5 fibre/hp connected configured ok pcie6 fibre/hp connected configured ok
A flashing Power indicator LED indicates that the HBA is being prepared for removal. A dark Power indicator LED indicates that the HBA is ready to be removed.