Go to main content
Oracle® ZFS Storage ZS5-ES Installation Guide, Release OS8.7.x

Exit Print View

Updated: August 2017
 
 

Rack Requirements

The rack into which you install the Oracle ZFS Storage ZS5-ES must meet the requirements listed in the following table. Oracle's Sun Rack II is compatible with the Oracle ZFS Storage ZS5-ES. For information about Oracle's Sun Rack II, see Preparing for Installation.

Table 8  Rack Requirements
Item
Requirement
Structure
Four-post rack (mounting at both front and rear). Supported rack types: square hole (9.5 mm) and round hole (M6 or 1/4-20 threaded only.
Two-post racks are not compatible.
Rack horizontal opening and unit vertical pitch
Conforms to ANSI/EIA 310-D-1992 or IEC 60927 standards.
Distance between front and rear mounting planes
Minimum 61 cm and maximum 91.5 cm (24 inches to 36 inches).
Clearance depth in front of front mounting plane
Distance to front cabinet door is at least 2.54 cm (1 inch).
Clearance depth behind front mounting plane
Distance to rear cabinet door is at least 90 cm (35.43 inches) with the cable management arm, or 80 cm (31.5 inches) without the cable management arm.
Clearance width between front and rear mounting planes
Distance between structural supports and cable troughs is at least 45.6 cm (18 inches).
Minimum clearance for service access
  • Clearance, front of controller: 123.2 cm (48.5 inches)

  • Clearance, rear of controller: 91.4 cm (36 inches)

Related Information