Go to main content
Oracle® ZFS Storage ZS5-ES Installation Guide, Release OS8.7.x

Exit Print View

Updated: August 2017
 
 

Controller Rear Cable Connections and Ports

The following figure shows the locations of cable connectors and ports on the back of the Oracle ZFS Storage ZS5-ES controller and the cables and devices that you would typically connect to them.

Figure 3  Controller Rear Panel Cabling Reference

image:Figure showing the rear panel connections and ports.

No.
Cable Port or Expansion Slot
Description
1
Power supply 0 input power
Power supply 1 input power
The controller has two power supply connectors, one for each power supply.
Do not attach power cables to any installed power supplies until you have finished connecting the data cables to the controller. The controller goes into standby power mode and the Oracle ILOM service processor initializes when the AC power cables are connected to the power source. System messages might be lost after 60 seconds if the controller is not connected to a terminal, PC, or workstation.

Note -  Oracle ILOM will signal a fault on any installed power supply that is not connected to an AC power source, since it might indicate a loss of redundancy.

2
Serial management port (SER MGT)
The service processor SER MGT port uses an RJ-45 cable and is the default connection to the Oracle ILOM service processor. This port supports local connections to the controller and only recognizes Oracle ILOM command-line interface (CLI) commands. Typically you connect a terminal or a terminal emulator to this port.

Note -  This port does not support network connections.

3
Ethernet ports NET 3, NET 2, and NET 1
The 10-Gigabit Ethernet ports connect the appliance to the network. See Ethernet Ports for more information.
4
Ethernet port NET 0
Connect to the Oracle ILOM service processor using the Ethernet in-band port NET 0 (remapped from the NET MGT port). The Oracle ILOM sideband management feature enables you to use NET 0 to send and receive Oracle ILOM commands to and from the SP.

Note -  The ZS5-ES NET MGT port is deactivated at the factory.

Related Information