Three-Bar Neighbor Comparison
The Three-Bar Neighbor Comparison is designed to motivate customers to save energy by showing how their usage compares to others in their area. It places the customer ("You") alongside two groups—"Efficient Homes" and "Similar Homes"—in a horizontal bar graph. An insight statement indicates whether the customer falls into one of three categories:
- Great
- Good
- Fair
A short message explains how the customer's energy use compares specifically to efficient homes nearby. Below the graph, an informational section clarifies that "Efficient Homes" represent the 20% of similar homes in the comparison group that used the least energy during the billing period, and provides additional context on how to interpret the graph.
The neighbor comparison experience is consistent across Digital Self Service – Energy Management and the customer's report. For example, if a customer sees a Three-Bar Neighbor Comparison in their report, the same designation will appear in Digital Self Service – Energy Management. For more information about the web version of the neighbor comparison, see Digital Self Service Energy Management Neighbor Comparison.
Appears in: Progress Report, Welcome and Announcement Report, Limited Income Report, Time of Use Report, Solar Report, Electric Vehicle Report
Note:
For most report types, utilities have the option of including either the Three-Bar Neighbor Comparison module or Efficiency Zone in their report.Requirements
Utility Requirements
| Category | Description |
|---|---|
| Required Cloud Service | Energy Efficiency Cloud Service |
| Scale | Less than 100,000 per week |
Customer Requirements
| Category | Description |
|---|---|
| Billing Frequency | Monthly, bi-monthly, or quarterly. |
| Data Delivery Frequency | Monthly, bi-monthly, or quarterly |
| Data Requirements | Billing data and third-party data (GIS and parcel data). |
| Data History | A minimum of one historical bill. |
| Data Coverage | Not applicable. Billing level data is used. |
| Supported Fuels |
|
Limitations
- Neighbor Selection: A minimum number of neighbors (the default target is 100) must be selected for the customer. See Neighbor Selection - Detailed for more information.
- Home Energy Reports vs. Web: Customers with an Efficiency Zone as part of their experience will also see a web version of the efficiency zone on the web portal. The web version of the Efficiency Zone that differs slightly from the print version. See the Neighbor Comparison section of the Oracle Utilities Opower Digital Self Service - Energy Management Cloud Service Product Overview for more information.
- Third-Party Data: Third-party data (GIS and parcel data) is needed to identify neighbors for the neighbor selection process.
User Experience
This section describes the user experience for each report type.
Three-Bar Neighbor Comparison
This section describes the user experience for the Progress Report, Welcome and Announcement Report, Limited Income Report, and Time of Use Report.
Heading: Notifies the customer that the neighbor comparison gives them a comparison of their energy use to similar homes.
Bar Chart: Displays how much energy each group in the comparison used. Typically, the bar with the smallest value is on top and the bar with the largest value is on the bottom.
- You: Indicates how the customer is doing. This is often a color that corresponds to the utility brand color.
- Similar Homes: Indicates how all the customer's neighbors are doing. It is usually a gray or neutral color. The energy use data that is shown is the mean energy use value.
- Efficient Homes: Displays a usage value for the most efficient 20% of the customer's similar homes. It is usually colored green because green is commonly associated with energy efficiency. Note that the efficient homes value that appears in the module is not an average of the top 20% of similar homes. A threshold value—the 20th percentile of similar homes—is used to determine the efficient homes value. Efficient homes are not chosen in advance.
The appearance of the bar graph varies depending on the customer's comparison state. Possible comparison states include:
- Fair: Home energy use, excluding electric vehicle charging, was more than efficient homes or average neighbors.
- Good: Home energy use, excluding electric vehicle charging, was more than efficient than similar homes or average neighbors.
- Great: Total energy use was less than efficient homes or average neighbors.
- Near: Within more or less than five percent of the average efficient homes or average neighbor value.
Legend: Indicates what portions of the graph indicate home energy use, efficient homes, and similar homes.
Explainer text: Explains why the bar chart appears the way it does. It includes a definition of efficient homes, and the fuel units in the module.
Insight Statement: Provides information about why the bar chart appears the way it does. The insight states are related to the Benchmark module states of Great, Good, and Fair. The insights states are related to the Benchmark state. See the Energy Use Benchmark module for more information.
- Top insight: Displays a percentage for either how much more or less the customer used compared to their "efficient homes. For example, "29% more electricity than efficient homes." The percentage color changes depending on where the customer's usage falls on the Benchmark Module gauge. If the customer's usage is "great" or "good" the percentage is green. If the customer's usage falls in the "fair" range, the percentage is orange. By default the percentage threshold for the top insight is >100%. When the threshold is exceeded, alternative insight statements are used to ensure that the insights have a material impact on the user. See the Insight Statement for more information.
- Bottom insight: Tells the customer how their usage compared to compared to "neighbors" (that is, all neighbors, including efficient neighbors). The insight states are related to the Benchmark Module states of Great, Good, and Fair.
Note:
In some cases, a customer's billing periods do not align exactly with those of their comparison groups. To accurately calculate averages for similar and efficient homes, the system aligns these usage periods with the customer's billing cycle. When misalignment occurs, the application adjusts, or "time shifts," neighboring homes' energy usage by accounting for the overlap between billing periods. These prorated values are then used to calculate the comparison averages.Solar Three-Bar Neighbor Comparison
Note:
In the Solar Report, 'energy use' is replaced with 'net energy' to capture both use and production.This image is an example of a Solar Three-Bar Neighbor Comparison for a solar customer with a positive comparison state.
Heading: Identifies the customer as a solar customer and indicated that they will be compared to other solar homes or neighbors:
- Similar Homes: Indicates how all the customer's neighbors are doing.
- Neighbors: Provides how the customer's net energy compares to other neighbors with solar.
Bar chart: Shows a customer's net energy compared to other homes with solar. The comparison groups are informed by the same logic as the standard experience but only include other homes with solar. A net zero indicator and three increment indicators are included on the graph to help orient the customer. Bar graph categories include:
- Efficient homes with solar: Displays a usage value for the most efficient 20% of the customer's similar homes.
- Similar homes with solar:Indicates how all the customer's neighbors with solar are doing.
- You: Provides the customer's energy use.
The appearance of the bar graph varies depending on whether the customer has positive, negative, or net zero energy use. Possible comparison states include:
- Positive comparison state: All graph bars show positive readings, meaning that the customers used more energy than their panels produced.
- Straddle comparison state: Displays a mix of positive and negative reads.
- Negative comparison state: If the customers used less energy than their panels produced, all graph bars show negative readings.
Legend: Indicates what portions of the graph indicate the customer's home energy use , efficient homes with solar, and similar homes with solar.
Explainer Text: Provides definitions of net energy, comparison groups, and fuel used in the insights. See User Experience Variations for more information.
Insight Statement: Provides information about why the bar chart appears the way it does. The insight states are related to the solar comparison state:
-
Positive Comparison Insight Statement: In a positive comparison state, all graph bars show positive readings, meaning that the customers used more energy than their panels produced.
- Top Insight: Displays a percentage for either how much more or less energy the customer used compared to efficient homes up to a configurable threshold.
- Bottom Insight: Provides the customer how their usage compared to compared to similar homes. By default the percentage threshold for the top insight is >100%. When the threshold is exceeded, positive alternative insight statements are used to ensure that the insights have a material impact on the user.
-
Straddle Comparison Insight Statement: In the straddle comparison state, the graph shows a mix of positive and negative reads.
- Top Insight: Tells the customer how much energy the customer's solar panels produced compared to how much energy they used.
- Bottom Insight: Tells the customer how their net energy use compares to efficient homes.
-
Negative Comparison Insight Statement: If the customers used less energy than their panels produced, all graph bars show negative readings.
- Top Insight:Tells the customer that their solar panels covered the amount of energy they used.
- Bottom Insight: Tells the customer how their net energy use compares to efficient homes.
Electric Vehicle Three-Bar Neighbor Comparison
The Three-Bar Neighbor Comparison appears in the Electric Vehicle Introduction. The Electric Vehicle Three-Bar Neighbor Comparison is adapted to show the impact of electric vehicle charging on home energy use. The graph varies based on the benchmark state, fuel type, and whether the customer has similar homes or neighbors language. See User Experience Variations for more information.
This image is an example of the Electric Vehicle Three-Bar Neighbor Comparison for an electric vehicle customer with a good comparison state and similar homes language.
Heading: Indicates that the customer will be compared to other homes.
Bar chart: Displays a customer's energy use compared to other single family homes that may or may not have electric vehicles. The comparison groups are informed by the same logic as the standard experience but includes the customer's electric vehicle charging. Bar graph categories include:
- Efficient homes: Provides a usage value for the most efficient 20% of the customer's similar homes.
- Similar homes: Indicates how all the customer's neighbors are doing.
- You: Highlights the home energy use in relation to Efficient and Similar homes. It includes the customer's home energy use, electrical vehicle charging, and total energy use, but excludes EV charging
The appearance of the bar graph varies depending on the customer's comparison state. Possible comparison states include:
- Fair: Home energy use, excluding electric vehicle charging, was more than efficient homes or average neighbors.
- Good: Home energy use, excluding electric vehicle charging, was more than efficient than similar homes or average neighbors.
- Great: Total energy use was less than efficient homes or average neighbors.
- Near: Within more or less than five percent of the average efficient homes or average neighbor value.
Legend: Indicates what portions of the graph indicate home energy use excluding EV charging, and energy use for EV charging at home.
Explainer Text: Defines the comparison group and efficient homes. The explainer state and text is determined by the available customer data. For example, square footage, heating source, home type, and fuel type data.
Insight Statement: Provides information about why the bar chart appears the way it does. The insight states are related to the Benchmark module states of Great, Good, and Fair. The insights states are related to the Benchmark state. See the Energy Use Benchmark module for more information.
- Top insight: Displays a percentage for either how much more or less the customer used compared to their "efficient homes. The percentage color changes depending on whether the customer's usage is Great, Good, and Fair.
- Bottom insight: Tells the customer how their usage compared to compared to all neighbors, including efficient neighbors.
User Experience Variations
Explainer Text
Explainer Text: The explainer text varies by the available customer data, including:
- Square Footage
- Heating Source
- Home Type
- Fuel type
For example, the words "heating source" and "square footage" will appear in the explainer text for customers with confirmed square footage and heating source data, but not for others.
Solar Three-Bar Explainer: The explainer text for the Solar Three-Bar includes content explaining net energy, the solar comparison group, and fuel. These explainers vary by fuel type, whether the customer receives similar homes or neighbors language, and home type. For example, "electricity" is used in reports for customers with net energy / dual fuel, and "energy" is used for customers with net energy / electric-only reports. "Efficient homes" or "Efficient Neighbors" appears depending on the neighbors language selected for the utility program. The following example of solar explainer text is for a solar customer with net energy / duel fuel enrolled in a program with similar homes language.
"Net energy is the difference between the amount of electricity your solar panels produce and the amount of gas and electricity you use. Efficient homes with solar are the 20% of homes in your comparison group with the lowest net energy."
Solar Three-bar Comparison Group Explainer Text: The comparison group explainer includes home type data. For example, if a customer's home type can not be confirmed, the text states that the comparison group is made of, "100 similar homes with solar in your area." If the customer data confirms that the customer lives in a single-family home, the text mentions that they were compared to other single-family homes, "100 single-family homes with solar in your area."
Insight Statement
The insight statement summarizes the customer's energy use in comparison to efficient homes or similar neighbors. It is determined by the customer's benchmark category, fuel type, and the percentage threshold used to identify the top insight..
The following table is an example of how the insight statement varies for a electric or dual fuel customer in a Good benchmark state.
| Benchmark State | Language | Insight Type | Top Insight | Bottom Insight |
|---|---|---|---|---|
| Good | Similar homes | Standard | Your energy use was higher than efficient homes by XX% | You used less energy than similar homes. |
| Alternative | Your energy use was higher than efficient homes | |||
| Neighbors | Standard | Your energy use was higher than efficient neighbors by XX% | You used less energy than average neighbors | |
| Alternative | Your energy use was higher than efficient neighbors |
The following table is an example of how the insight statement varies for a solar customer in a with a positive comparison state and a good benchmark state.
| Benchmark state | Language | Insight Type | Top Insight | Bottom Insight |
|---|---|---|---|---|
| Good | Similar Homes | Standard | Your net energy was higher than efficient homes by X% | Your net energy was lower than similar homes |
| Alternative | Your net energy was higher than efficient neighbors by X% | Your net energy was lower than average neighbors | ||
| Neighbors | Standard | Your net energy was higher than efficient homes | Your net energy was lower than similar homes | |
| Alternative | Your net energy was higher than efficient neighbors | Your net energy was lower than average neighbors |
The following table is an example of how the insight statement can vary for an electric vehicle customer in a Good benchmark state.
| Benchmark State | Language | Insight Type | Top Insight | Bottom Insight |
|---|---|---|---|---|
| Good | Similar homes | Standard | Your home energy use, excluding EV charging, was higher than efficient homes by | Your home energy use, excluding EV charging, was less than similar home. |
| Your total energy use was less than average neighbors | ||||
| Alternative | Your home energy use, excluding EV charging, was higher than efficient homes | You used less home energy, excluding EV charging, than similar homes | ||
| Neighbors | Standard | Your home energy use, excluding EV charging, was more than efficient neighbors by | Your home energy use, excluding EV charging, was less than average neighbors | |
| Alternative | Your home energy use, excluding EV charging, was higher than efficient neighbors | You used less home energy, excluding EV charging, than average neighbors |
Three-bar Graph
Neighbor Comparison Placement
Utilities have the option to swap the placement of the Quadrants with the Three-Bar Neighbor Comparison or Efficiency Zone. See the Welcome and Announcement Report.
Solar Comparison States
The appearance of the bar graph varies depending on the graph comparison state:
Positive Comparison State: All graph bars show positive readings, meaning that the customers used more energy than their panels produced. This image is an example of a positive comparison state.
When the large number in the sidebar reaches a value of 101% or more, a positive alternate insight without a percentage is displayed to avoid comprehension issues. For example, "Nice! Your net energy was lower than efficient homes!"
Straddle Comparison State: In the straddle comparison state, the graph shows a mix of positive and negative reads. The module varies based on fuel type, language type, and whether the customer's "You" bar is positive or negative.
Negative Comparison State: If the customers used less energy than their panels produced, all graph bars show negative readings. The module varies depending on the customer's benchmark state and fuel type.
The following image is an example of a negative comparison state in a Good benchmark state.
The following image shows an example of a negative comparison state when the "You" value is rounded to zero.