The SPARC SuperCluster T4-4 power distribution units (PDUs) achieve earth ground through their power cords. For additional grounding, attach a chassis earth ground cable to the SPARC SuperCluster T4-4. The additional ground point enables electrical current leakage to dissipate more efficiently.
Caution - Do not install a ground cable until you confirm that there is proper PDU receptacle grounding. The PDU power input lead cords and the ground cable must reference a common earth ground. |
An earth ground is required. See Grounding Requirements
The ground cable attachment area might have a painted or coated surface that must be removed to ensure solid contact.
The attachment point is an adjustable bolt that is inside the rear of the rack on the right side.