Documentation, Support, and Training
Reviewing Front and Rear Panels
Install the System With the Express Rail Kit
(Optional) Install the System With the Standard Rail Kit
(Optional) Install the Cable Management Arm (CMA)
Remove the System From the Rack
Remove the Express Slide Rails from the Rack
Remove the Standard Slide Rails from the Rack
Connecting to Host Bus Adapters (HBAs)
(Optional) Install the Power Cord Retainer
Access Configuration (Zoning) Support
Access Configuration (Zoning) Guidelines
Sun Storage F5100 Flash Array Overview
Obtaining the Chassis Serial Number
Choosing a Method for Diagnosing Faults
Diagnosing Faults With Sun StorageTek Common Array Manager Software
Diagnosing Faults With LEDs and Indicators
Preparing to Service the System
Performing an Antistatic Discharge
Customer-Replaceable and Field-Replaceable Components
Replacing an Energy Storage Module
Replacing the Motherboard Assembly
Replacing a Power Distribution Board
Replacing the Connector Board Assembly
Replacing the Energy Storage Backplane
Returning the System to Service
Install the Chassis to Maintenance Position
Return the System to the Fully Installed Position
This illustration depicts standard system components. Other options might be available with your system.
Figure 1 System Inventory
1 Sun Storage F5100 Flash Array
2 Safety documentation
3 Antistatic wrist strap
4 Cable management arm
5 Power cord retainers
6 SAS three meter cable (2)
7 Express rack rail kit: 2 slide rails, 2 mounting brackets, instruction card.
8 Not pictured: 2 cable ties.