JavaScript is required to for searching.
Skip Navigation Links
Exit Print View
Oracle Switch ES1-24 Documentation
search filter icon
search icon

Document Information

Using This Documention

Product Notes

Related Documentation

CLI Command Modes

Feedback

Support and Accessibility

Installation

Understanding the Installation

Installation Task Overview

Front Panel Components

Rear Panel Components

Confirming Specifications

Physical Specifications

Electrical Specifications

Environmental Specifications

Understanding Cabling

Understanding Management and Power Cabling

Understanding Data Cabling

Single-Switch Location Guidelines

Preparing for Installation

ESD Precautions

Tools Needed for Installation

Verify Switch Kit Contents

Verify Rack Rail Kit Contents

Assemble an SFP+ Data Cable

Route Cables

Installing the Switch

Assemble a Filler

Attach the Rails to the Switch

Attach Telco Adapters to the Rack Slides

Attach the Rack Slides to the Rack

Install the Switch Into the Rack

Attach Power Cords

Install the Air Duct and Front Support

Attach Data and Management Cables

Prepare the Front Support and Small Air Duct

Powering On the Switch

Power On the Switch

Oracle ILOM Overview

Verify the DHCP-Assigned IP Address and Host Name

Configure Network Management From the CLI (SER MGT)

Log Into the Oracle ILOM Web (NET MGT)

Log Into the Oracle ILOM CLI (NET MGT)

Log Into the Oracle ILOM CLI (SER MGT)

Configuration

Administering the Switch

Log In to the Oracle ILOM CLI

Create a SEFOS User

Change a SEFOS User Privilege Level

Configure Network Management From the Web Interface

Configure Network Management From the CLI

Log Out of the Oracle ILOM CLI

Update the Firmware

Administering SEFOS

SEFOS Setup Tasks

Understanding SEFOS Basics

Configuring the SEFOS Environment

Managing Configuration Files

Managing Log Files

Configuring the Switching Feature

Switching Feature Topology

Configure Initial Settings

Verify the Configuration

Configure VLAN Forwarding

Verify VLAN Membership

Configure RSTP

Configure LA

Save a Configuration

Configuring the Routing Feature

Routing Feature Topology

Configuring Static Routing

Configuring Dynamic Routing

Disabling Routing

Service

Detecting and Managing Faults

Front Panel LEDs

Rear Panel LEDs

Check Switch Status (LEDs)

Sensors Overview

Check Switch Status (Oracle ILOM)

Component Sensor Targets

Motherboard Sensor Targets

Preparing for Service

ESD Precautions

Tools Needed for Service

Replaceable Components

Remove the Front Support and Air Duct

Remove the CMA

Install the CMA

Servicing Power Supplies

Power Off a Power Supply

Remove a Power Supply

Install a Power Supply

Power On a Power Supply

Servicing the Fan Module

Remove the Fan Module

Install the Fan Module

Glossary

Index

Verify Rack Rail Kit Contents


Note - The Rack rail kit is not included with the switch kit and must be ordered separately.


  1. Identify the prerequisite and subsequent installation tasks that you must perform in conjunction with this procedure.

    See Installation Task Overview.

  2. Use this illustration and accompaning table to verify that your Rack rail kit is complete.
    image:Figure shows the contents of the Rack rail kit.
    No.
    Description
    1
    Rack slides (2)
    2
    Chassis rails (2) (might be assembled with rack slides)
    3
    Center slide
    4
    Center rail (might be assembled with center slide)
    5
    CMA and cover (always installed on rear of rack)
    6
    Front bracket (always installed on front of rack)
    7
    Assorted screws and cage nuts
    • M6x14 screws (12)

    • M5x10 screws (4)

    • M4x6 flathead screws (24)

    • M6 cage nuts (14)

    8
    Telco adapters (2)
    9
    Filler panels (2) (for single-switch configurations)
    10
    Large and small air ducts (2)
  3. If the chassis rails are attached to the rack slides, separate them now.
    1. Press the green tab at the end of the rack slide.
      image:Figure shows sliding the chassis rail out of the rack slide.
    2. Carefully slide the chassis rail all the way out of the rack slide.
    3. Repeat Step a and Step b for the other rack slide.
  4. If the center rail and center slide are assembled together, separate them now.
    image:Figure shows separating the center rail and center slide.
  5. Consider your next step.
    • If you are using optical data cables that require assembly, assemble them now.

      See Assemble an SFP+ Data Cable.

    • If you are using prewired data cables, route the data, power, and management cables.

      See Route Cables.

Related Information