Understanding the Installation
Understanding Management and Power Cabling
Single-Switch Location Guidelines
Attach the Rails to the Switch
Attach Telco Adapters to the Rack Slides
Attach the Rack Slides to the Rack
Install the Switch Into the Rack
Install the Air Duct and Front Support
Attach Data and Management Cables
Prepare the Front Support and Small Air Duct
Verify the DHCP-Assigned IP Address and Host Name
Configure Network Management From the CLI (SER MGT)
Log Into the Oracle ILOM Web (NET MGT)
Log Into the Oracle ILOM CLI (NET MGT)
Log Into the Oracle ILOM CLI (SER MGT)
Change a SEFOS User Privilege Level
Configure Network Management From the Web Interface
Configure Network Management From the CLI
Log Out of the Oracle ILOM CLI
Configuring the SEFOS Environment
Configuring the Switching Feature
Configuring the Routing Feature
Note - If you are removing the front support and air duct from a switch with the data cables on the cold aisle, the procedure is the same, however the illustrations differ slightly from your situation.
Note - If the switch is installed with the data cables on the cold aisle, slide the front support off onto the data cables.
Note - If the switch is installed with the data cables on the cold aisle, slide the air duct off onto the data cables.
If you are servicing power supplies, return to the procedure, Power Off a Power Supply.
If you are servicing the fan module, return to the procedure, Remove the Fan Module.