Install the ID PROM
Remove the ID PROM
Servicing the ID PROM
Verify the ID PROM
Identifying Components
Component Locations
Prepare the Modular System and Server Module
Installation Task Overview
Tools Needed for Installation
Install the Battery
Replace the Cover
Install a DIMM
Transfer Components to the New Enclosure Assembly
Install the ID PROM
Installing the OS
Install the Server Module Into the Modular System
Installing the Server Module
Install the SP Card
Install a USB Drive
Shipping Kit