Preparing to Install the Server
This section describes the information you need to know before you install the server into a
rack. It includes the topics shown in the following table.
| 
|  |  |  
| Review the server physical, electrical, and environmental specifications. |  |  
| Review ventilation and cooling requirements for the rackmounted server. |  |  
| Unpack the server and verify the ship kit contents. |  |  
| Assemble the tools required for installation. |  |  
| Review ESD requirements and take safety precautions.  |  |  
| Install any optional components into the server. |  |  |