Use these instructions to remove the server from its container and inventory the contents.
The following items are packaged with the Oracle Server X5-8:
Power cords, packaged separately with country kit
Rackmount kit containing shelf rails and installation instructions
Miscellaneous hardware and cables
Legal and safety documents
All required server components and most options are installed at the factory. However, some ordered options might be packaged separately.
The following figure shows the components of the shipping container:
|
Before You Begin
This procedure requires a mechanical lift.
Caution - Equipment damage or personal injury. The server is heavy. Do not attempt to install the server without a mechanical lift. |
If a shipping carton appears damaged, request that the carrier's agent be present when the carton is opened. Keep all contents and packing material for the agent's inspection.
For rack mounting instructions, see Rack Installation Instructions.
Next Steps