Go to main content

Oracle® Exadata Storage Server X6-2 High Capacity Service Manual

Exit Print View

Updated: January 2018
 
 

Returning the Server to Operation

After replacing components inside of the server, perform the procedures in the following sections.

Description
Links
Install the server top cover.
Install the fan door assembly top cover.
Remove any antistatic measures.
Reinstall the server chassis in the rack.
Return the server to the normal rack position.
Reconnect power and data cables.
Power on the server.

Related Information