Reinstall the Server in the Rack

After servicing the system, reinstall it into the rack.


Caution

Caution  -  Deploy any rack anti-tilt mechanism before installing the server into the rack.



Caution

Caution  -  The server weighs approximately 63 pounds (28.5 kg). Two people are required to carry the chassis and install it in the rack.


  1. Lift the server from the antistatic mat, and reinstall the server into the rack.

    Refer to Installing the Storage Server Into a Rack in Oracle Exadata Storage Server X6-2 High Capacity Installation Guide for the installation instructions specific to your rackmount kit.

  2. If the cable management arm (CMA) is not installed, that is, you removed it because you removed the server completely out of the rack, install the CMA.

    For installation instructions for the CMA, refer to Install the Cable Management Arm in Oracle Exadata Storage Server X6-2 High Capacity Installation Guide .

  3. If the cables are disconnected from the rear of the server, that is, you disconnected the cables because you removed the server completely out of the rack, reconnect the cables.