The data cables, SP cables, and power cords connected to the rear of the server can be routed up through the top of the server, down through a floor opening, or both. Consult with your facility manager to determine the best method to route the cables and power cords at your site.
Sun Rack II User's Guide at http://www.oracle.com/goto/sunrackii/docs