Installing a Rackmounted Server
Follow these procedures to prepare and secure a rackmounted server at the installation
site.
Note -
These procedures are for servers factory-installed in an Oracle rack. If you are
installing a stand-alone server into your own rack, go to
Installing a Stand-Alone Server in a Rack for the rackmounting
instructions.
|
|
|
1.
|
Inspect the installation site and prepare it for the server
installation.
|
|
2.
|
Receive and unload the server from the delivery truck.
|
|
3.
|
Unpack the server from the shipping container.
|
|
4.
|
Safely move the server to the installation site.
|
|
5.
|
Stabilize the server to the installation site's floor using the
leveling feet.
|
|
6.
|
Install any optional hardware.
|
|
|