Hardware Installation Overview
Hardware Installation Task Overview
Hardware Installation Documents
Prepare the Site for the Racks
Heat Dissipation Specifications
Network Infrastructure Requirements
Compute Server Default Host Names and IP Addresses
Compute Server Network Components
Storage Rack Network Components
Cable the ZFS Storage Appliance
ZFS Appliance Power Cord Connection Reference
ZFS Storage Appliance Cabling Reference
Leaf Switch 1 Cabling Reference
Leaf Switch 2 Cabling Reference
IB Switch-to-Switch Cabling Reference
Cable the Ethernet Management Switch
Ethernet Management Switch Cabling Reference
Connect SuperCluster M6-32 to the Facility Networks
Expansion Rack Default IP Addresses
Understanding Internal Cabling (Expansion Rack)
Administrative Gigabit Ethernet Port Cabling
These topics describe how to prepare your site for the installation of the storage rack. The tasks and specifications also apply to the optional expansion racks.
Note - This chapter only provides site preparation information for the storage rack and expansion racks. For information on how to prepare the site for the compute server, refer to the SPARC M5-32 and SPARC M6-32 Servers Installation Guide, as described in Hardware Installation Documents.