Hardware Installation Overview
Hardware Installation Task Overview
Hardware Installation Documents
Preparing the Site (Storage Rack and Expansion Racks)
Prepare the Site for the Racks
Heat Dissipation Specifications
Network Infrastructure Requirements
Compute Server Network Components
Storage Rack Network Components
Cable the ZFS Storage Appliance
ZFS Appliance Power Cord Connection Reference
ZFS Storage Appliance Cabling Reference
Leaf Switch 1 Cabling Reference
Leaf Switch 2 Cabling Reference
IB Switch-to-Switch Cabling Reference
Cable the Ethernet Management Switch
Ethernet Management Switch Cabling Reference
Connect SuperCluster M6-32 to the Facility Networks
Expansion Rack Default IP Addresses
Understanding Internal Cabling (Expansion Rack)
Administrative Gigabit Ethernet Port Cabling
This table lists the SuperCluster M6-32 default host names and IP addresses. The names and addresses might be different if they were changed to meet site requirements. Refer to your configuration worksheets for details.
|
Configuration worksheets