JavaScript is required to for searching.
Skip Navigation Links
Exit Print View
Oracle SuperCluster M6-32

Owner's Guide: Installation

search filter icon
search icon

Document Information

Using This Documentation

Product Documentation Library

Feedback

Installing SuperCluster M6-32

Hardware Installation Overview

Weight Specifications

Hardware Installation Task Overview

Hardware Installation Documents

Preparing the Site (Storage Rack and Expansion Racks)

Prepare the Site for the Racks

Storage Rack Components

Physical Specifications

Reviewing Power Requirements

PDU Power Specifications

Facility Power Requirements

PDU Thresholds

Preparing for Cooling

Heat Dissipation Specifications

Airflow Requirements

Perforated Floor Tiles

Environmental Specifications

Preparing the Network

Network Topology

Network Infrastructure Requirements

Compute Server Default Host Names and IP Addresses

Install Cable Drops

Prepare DNS

Cabling SuperCluster M6-32

Compute Server Network Components

Storage Rack Network Components

Cable the ZFS Storage Appliance

ZFS Appliance Power Cord Connection Reference

ZFS Storage Appliance Cabling Reference

Cable IB Switches

Leaf Switch 1 Cabling Reference

Leaf Switch 2 Cabling Reference

IB Switch-to-Switch Cabling Reference

Cable the Ethernet Management Switch

Ethernet Management Switch Cabling Reference

Connect SuperCluster M6-32 to the Facility Networks

Connecting Expansion Racks

Expansion Rack Overview

Expansion Rack Components

Expansion Rack Layouts

Installing Expansion Racks

One Expansion Rack Cabling

Two Expansion Racks Cabling

Three Expansion Racks Cabling

Four Expansion Racks Cabling

Five Expansion Racks Cabling

Six Expansion Racks Cabling

Seven Expansion Racks Cabling

Expansion Rack Default IP Addresses

Understanding Internal Cabling (Expansion Rack)

Oracle ILOM Cabling

Administrative Gigabit Ethernet Port Cabling

Single-Phase PDU Cabling

Three-Phase PDU Cabling (Full Rack)

IB Network Cabling

Glossary

Index

One Expansion Rack Cabling

These abbreviations are used in the tables:

Table 16 IB Switch Connections for the Storage Rack When Adding One Expansion Rack

Leaf Switch
Connection
Cable Length
SR-U22 within SR
SR-U22-P8A to SR-U1-P3A

SR-U22-P8B to SR-U1-P4A

SR-U22-P9A to SR-U1-P5A

SR-U22-P9B to SR-U1-P6A

3 m
SR-U22 to R1
SR-U22-P10A to R1-U1-P7A

SR-U22-P10B to R1-U1-P8A

SR-U22-P11A to R1-U1-P9A

SR-U22-P11B to R1-U1-P10A

5 m
SR-U20 within SR
SR-U20-P8A to SR-U1-P3B

SR-U20-P8B to SR-U1-P4B

SR-U20-P9A to SR-U1-P5B

SR-U20-P9B to SR-U1-P6B

3 m
SR-U20 to R1
SR-U20-P10A to R1-U1-P7B

SR-U20-P10B to R1-U1-P8B

SR-U20-P11A to R1-U1-P9B

SR-U20-P11B to R1-U1-P10B

5 m

Table 17 IB Switch Connections for the First Expansion Rack of One

Leaf Switch
Connection
Cable Length
R1-U22 within R1
R1-U22-P8A to R1-U1-P3A

R1-U22-P8B to R1-U1-P4A

R1-U22-P9A to R1-U1-P5A

R1-U22-P9B to R1-U1-P6A

3 m
R1-U22 to SR
R1-U22-P10A to SR-U1-P7A

R1-U22-P10B to SR-U1-P8A

R1-U22-P11A to SR-U1-P9A

R1-U22-P11B to SR-U1-P10A

5 m
R1-U20 within R1
R1-U20-P8A to R1-U1-P3B

R1-U20-P8B to R1-U1-P4B

R1-U20-P9A to R1-U1-P5B

R1-U20-P9B to R1-U1-P6B

5 m
R1-U20 to SR
R1-U20-P10A to SR-U1-P7B

R1-U20-P10B to SR-U1-P8B

R1-U20-P11A to SR-U1-P9B

R1-U20-P11B to SR-U1-P10B

5 m
Related Information