Oracle SuperCluster M6-32

Owner's Guide: Installation

search filter icon
search icon

Document Information

Using This Documentation

Product Documentation Library

Feedback

Installing SuperCluster M6-32

Hardware Installation Overview

Weight Specifications

Hardware Installation Task Overview

Hardware Installation Documents

Preparing the Site (Storage Rack and Expansion Racks)

Prepare the Site for the Racks

Storage Rack Components

Physical Specifications

Reviewing Power Requirements

PDU Power Specifications

Facility Power Requirements

PDU Thresholds

Preparing for Cooling

Heat Dissipation Specifications

Airflow Requirements

Perforated Floor Tiles

Environmental Specifications

Preparing the Network

Network Topology

Network Infrastructure Requirements

Compute Server Default Host Names and IP Addresses

Install Cable Drops

Prepare DNS

Cabling SuperCluster M6-32

Compute Server Network Components

Storage Rack Network Components

Cable the ZFS Storage Appliance

ZFS Appliance Power Cord Connection Reference

ZFS Storage Appliance Cabling Reference

Cable IB Switches

Leaf Switch 1 Cabling Reference

Leaf Switch 2 Cabling Reference

IB Switch-to-Switch Cabling Reference

Cable the Ethernet Management Switch

Ethernet Management Switch Cabling Reference

Connect SuperCluster M6-32 to the Facility Networks

Connecting Expansion Racks

Expansion Rack Overview

Expansion Rack Components

Expansion Rack Layouts

Installing Expansion Racks

One Expansion Rack Cabling

Two Expansion Racks Cabling

Three Expansion Racks Cabling

Four Expansion Racks Cabling

Five Expansion Racks Cabling

Six Expansion Racks Cabling

Seven Expansion Racks Cabling

Expansion Rack Default IP Addresses

Understanding Internal Cabling (Expansion Rack)

Oracle ILOM Cabling

Administrative Gigabit Ethernet Port Cabling

Single-Phase PDU Cabling

Three-Phase PDU Cabling (Full Rack)

IB Network Cabling

Glossary

Index

Leaf Switch 2 Cabling Reference

Leaf switch 2 is the IB switch installed in U22.

image:A figure showing the IB switch connections.

When the table lists Compute server 0 or 1, choose the server that has an IB HCA PCIe card in the specified IOU.

When the table lists IOU n or n, choose the IOU that has an IB HCA PCIe card.

From
To
X = Factory Installed
U22

Leaf Switch 1

Port

Component
Location
Port
Cable
0A
Compute server 0
IOU 0
PCIe 2, P2
5m
0B
Compute server 0
IOU 0
PCIe 6, P2
5m
1A
Compute server 0
IOU 0
PCIe 10, P2
5m
1B
Compute server 0
IOU 0
PCIe 14, P2
5m
2A
Compute server 0
IOU 1
PCIe 2, P2
5m
2B
Compute server 0
IOU 1
PCIe 6, P2
5m
3A
Compute server 0
IOU 1
PCIe 10, P2
5m
3B
Compute server 0
IOU 1
PCIe 14, P2
5m
4A
Compute server 0 or 1
IOU 2 or 0
PCIe 2, P1
5m
4B
Compute server 0 or 1
IOU 2 or 0
PCIe 6, P1
5m
5A
Compute server 0 or 1
IOU 2 or 0
PCIe 10, P1
5m
5B
Compute server 0 or 1
IOU 2 or 0
PCIe 14, P1
5m
6A
Compute server 0 or 1
IOU 3 or 1
PCIe 2, P1
5m
6B
Compute server 0 or 1
IOU 3 or 1
PCIe 6, P1
5m
7A
Compute server 0 or 1
IOU 3 or 1
PCIe 10, P1
5m
7B
Compute server 0 or 1
IOU 3 or 1
PCIe 14, P1
5m
X
8A
IB leaf switch 1
U20
8A
2m
X
8B
IB spine switch
U1
0B
3m
X
9A
IB leaf switch 1
U20
9B
2m
X
9B
IB leaf switch 1
U20
9A
2m
X
10A
IB leaf switch 1
U20
10B
2m
X
10B
IB leaf switch 1
U20
10A
2m
X
11A
IB leaf switch 1
U20
11B
2m
X
11B
IB leaf switch 1
U20
11A
2m
12A
Unused
12B
ZFS storage controller 1
U25
PCIe 0, P2
2m
X
13A
Storage server 9
U18
PCIe 3, P2
3m
13B
ZFS storage controller 2
U26
PCIe 0, P2
2m
X
14A
Storage server 8
U16
PCIe 3, P2
3m
X
14B
Storage server 7
U14
PCIe 3, P2
3m
X
15A
Storage server 6
U12
PCIe 3, P2
3m
X
15B
Storage server 5
U10
PCIe 3, P2
3m
X
16A
Storage server 4
U8
PCIe 3, P2
3m
X
16B
Storage server 3
U6
PCIe 3, P2
3m
X
17A
Storage server 2
U4
PCIe 3, P2
3m
X
17B
Storage server 1
U2
PCIe 3, P2
3m
Related Information