Hardware Installation Overview
Hardware Installation Task Overview
Hardware Installation Documents
Preparing the Site (Storage Rack and Expansion Racks)
Prepare the Site for the Racks
Heat Dissipation Specifications
Network Infrastructure Requirements
Compute Server Default Host Names and IP Addresses
Compute Server Network Components
Storage Rack Network Components
ZFS Appliance Power Cord Connection Reference
ZFS Storage Appliance Cabling Reference
Leaf Switch 1 Cabling Reference
Leaf Switch 2 Cabling Reference
IB Switch-to-Switch Cabling Reference
Cable the Ethernet Management Switch
Ethernet Management Switch Cabling Reference
Connect SuperCluster M6-32 to the Facility Networks
Expansion Rack Default IP Addresses
Understanding Internal Cabling (Expansion Rack)
Administrative Gigabit Ethernet Port Cabling
After installing the ZFS storage controllers, disk shelf, and CMA, follow these steps to cable the ZFS storage appliance components to each other.
For specifications, see ZFS Storage Appliance Cabling Reference.
Refer to the ZFS Storage ZS3-ES Appliance Installation Guide. See Hardware Installation Documents.
If you detect any problems, correct them before continuing with the installation. Refer to the ZFS Storage ZS3-ES Appliance Service Manual. See Hardware Installation Documents.