Hardware Installation Overview
Hardware Installation Task Overview
Hardware Installation Documents
Preparing the Site (Storage Rack and Expansion Racks)
Prepare the Site for the Racks
Heat Dissipation Specifications
Network Infrastructure Requirements
Compute Server Default Host Names and IP Addresses
Compute Server Network Components
Storage Rack Network Components
Cable the ZFS Storage Appliance
ZFS Appliance Power Cord Connection Reference
ZFS Storage Appliance Cabling Reference
Leaf Switch 1 Cabling Reference
Leaf Switch 2 Cabling Reference
IB Switch-to-Switch Cabling Reference
Cable the Ethernet Management Switch
Ethernet Management Switch Cabling Reference
Connect SuperCluster M6-32 to the Facility Networks
Expansion Rack Default IP Addresses
Understanding Internal Cabling (Expansion Rack)
Administrative Gigabit Ethernet Port Cabling
Note - For information about preparing the site for expansion racks see Preparing the Site (Storage Rack and Expansion Racks).
Refer to the IB switch documentation for installation instructions. See Hardware Installation Documents.
This action enables the expansion racks to initialize while you perform the remaining installation steps. Refer to the Sun Rack II User's Guide. See Hardware Installation Documents.
Remove the cables listed in this table.
|
Use one of these sections based on the number of expansion racks you are adding: