Installing SuperCluster M6-32

Hardware Installation Overview

Weight Specifications

Hardware Installation Task Overview

Hardware Installation Documents

Preparing the Site (Storage Rack and Expansion Racks)

Prepare the Site for the Racks

Storage Rack Components

Physical Specifications

Reviewing Power Requirements

PDU Power Specifications

Facility Power Requirements

PDU Thresholds

Preparing for Cooling

Heat Dissipation Specifications

Airflow Requirements

Perforated Floor Tiles

Environmental Specifications

Preparing the Network

Network Topology

Network Infrastructure Requirements

Compute Server Default Host Names and IP Addresses

Install Cable Drops

Prepare DNS

Cabling SuperCluster M6-32

Compute Server Network Components

Storage Rack Network Components

Cable the ZFS Storage Appliance

ZFS Appliance Power Cord Connection Reference

ZFS Storage Appliance Cabling Reference

Cable IB Switches

Leaf Switch 1 Cabling Reference

Leaf Switch 2 Cabling Reference

IB Switch-to-Switch Cabling Reference

Cable the Ethernet Management Switch

Ethernet Management Switch Cabling Reference

Connect SuperCluster M6-32 to the Facility Networks

Connecting Expansion Racks

Expansion Rack Overview

Expansion Rack Components

Expansion Rack Layouts

Installing Expansion Racks

One Expansion Rack Cabling

Two Expansion Racks Cabling

Three Expansion Racks Cabling

Four Expansion Racks Cabling

Five Expansion Racks Cabling

Six Expansion Racks Cabling

Seven Expansion Racks Cabling

Expansion Rack Default IP Addresses

Understanding Internal Cabling (Expansion Rack)

Oracle ILOM Cabling

Administrative Gigabit Ethernet Port Cabling

Single-Phase PDU Cabling

Three-Phase PDU Cabling (Full Rack)

IB Network Cabling

Glossary

Index

Installing Expansion Racks


Note - For information about preparing the site for expansion racks see Preparing the Site (Storage Rack and Expansion Racks).


  1. Position the expansion racks adjacent to SuperCluster M6-32.

    See Hardware Installation Task Overview.

  2. If you are installing quarter racks, you must install an IB switch (spine switch) in each quarter rack in U1.

    Refer to the IB switch documentation for installation instructions. See Hardware Installation Documents.

  3. Connect the expansion rack power cords to facility power and apply power.

    This action enables the expansion racks to initialize while you perform the remaining installation steps. Refer to the Sun Rack II User's Guide. See Hardware Installation Documents.

  4. In the storage rack and in each expansion rack, remove factory installed leaf and spine cables so that ports are available to connect the racks together.

    Remove the cables listed in this table.


    From
    To
    Slot
    Port
    Slot
    Port
    Cable Length
    U1
    1B
    U20
    8B
    3 m
    U1
    0B
    U22
    8B
    3 m
    U20
    9B
    U22
    9A
    2 m
    U20
    10B
    U22
    10A
    2 m
    U20
    11B
    U22
    11A
    2 m
    U20
    8A
    U22
    8A
    2 m
    U20
    9A
    U22
    9B
    2 m
    U20
    10A
    U22
    10B
    2 m
    U20
    11A
    U22
    11B
    2 m
  5. Cable the expansion racks to the storage rack and to each other.

    Use one of these sections based on the number of expansion racks you are adding:

  6. Continue to the next SuperCluster M6-32 installation step.

    See Hardware Installation Task Overview.