Hardware Installation Overview
Hardware Installation Task Overview
Hardware Installation Documents
Preparing the Site (Storage Rack and Expansion Racks)
Prepare the Site for the Racks
Heat Dissipation Specifications
Network Infrastructure Requirements
Compute Server Default Host Names and IP Addresses
Compute Server Network Components
Storage Rack Network Components
Cable the ZFS Storage Appliance
ZFS Appliance Power Cord Connection Reference
ZFS Storage Appliance Cabling Reference
Leaf Switch 1 Cabling Reference
Leaf Switch 2 Cabling Reference
IB Switch-to-Switch Cabling Reference
Cable the Ethernet Management Switch
Ethernet Management Switch Cabling Reference
Expansion Rack Default IP Addresses
Understanding Internal Cabling (Expansion Rack)
Administrative Gigabit Ethernet Port Cabling
![]() | Caution - Authorized service personnel must perform SuperCluster software configuration tasks before SuperCluster M6-32 is connected to facility networks. |
Consult the network administrator and see Compute Server Default Host Names and IP Addresses.
See Install Cable Drops.
The Ethernet management switch is in the storage rack in U21. See Storage Rack Network Components.
Locate excess cable length either on top of the cabinets or under the raised floor.
Refer to the SPARC M5-32 and SPARC M6-32 Administration Guide. See Hardware Installation Documents.