Oracle SuperCluster M6-32

Owner's Guide: Installation

search filter icon
search icon

Document Information

Using This Documentation

Product Documentation Library

Feedback

Installing SuperCluster M6-32

Hardware Installation Overview

Weight Specifications

Hardware Installation Task Overview

Hardware Installation Documents

Preparing the Site (Storage Rack and Expansion Racks)

Prepare the Site for the Racks

Storage Rack Components

Physical Specifications

Reviewing Power Requirements

PDU Power Specifications

Facility Power Requirements

PDU Thresholds

Preparing for Cooling

Heat Dissipation Specifications

Airflow Requirements

Perforated Floor Tiles

Environmental Specifications

Preparing the Network

Network Topology

Network Infrastructure Requirements

Compute Server Default Host Names and IP Addresses

Install Cable Drops

Prepare DNS

Cabling SuperCluster M6-32

Compute Server Network Components

Storage Rack Network Components

Cable the ZFS Storage Appliance

ZFS Appliance Power Cord Connection Reference

ZFS Storage Appliance Cabling Reference

Cable IB Switches

Leaf Switch 1 Cabling Reference

Leaf Switch 2 Cabling Reference

IB Switch-to-Switch Cabling Reference

Cable the Ethernet Management Switch

Ethernet Management Switch Cabling Reference

Connect SuperCluster M6-32 to the Facility Networks

Connecting Expansion Racks

Expansion Rack Overview

Expansion Rack Components

Expansion Rack Layouts

Installing Expansion Racks

One Expansion Rack Cabling

Two Expansion Racks Cabling

Three Expansion Racks Cabling

Four Expansion Racks Cabling

Five Expansion Racks Cabling

Six Expansion Racks Cabling

Seven Expansion Racks Cabling

Expansion Rack Default IP Addresses

Understanding Internal Cabling (Expansion Rack)

Oracle ILOM Cabling

Administrative Gigabit Ethernet Port Cabling

Single-Phase PDU Cabling

Three-Phase PDU Cabling (Full Rack)

IB Network Cabling

Glossary

Index

Connect SuperCluster M6-32 to the Facility Networks


Caution

Caution - Authorized service personnel must perform SuperCluster software configuration tasks before SuperCluster M6-32 is connected to facility networks.


  1. Before connecting SuperCluster M6-32 to any external networks, verify that the factory-provided IP addresses do not conflict with the site network addresses.

    Consult the network administrator and see Compute Server Default Host Names and IP Addresses.

  2. Ensure that the facility network is prepared to connect to SuperCluster M6-32.

    See Preparing the Network.

  3. Label the cables used to connect to the facility Ethernet networks.

    See Install Cable Drops.

  4. Route and connect one facility management network cable to the Ethernet management switch port 24.

    The Ethernet management switch is in the storage rack in U21. See Storage Rack Network Components.

  5. Route and connect all client access network cables to the compute server EMS Ethernet ports.

    See Compute Server Network Components.

  6. Use velcro cable ties to secure cable bundles so that components can be serviced.

    Locate excess cable length either on top of the cabinets or under the raised floor.

  7. Log into SuperCluster M6-32 and verify network connectivity to the site.

    Refer to the SPARC M5-32 and SPARC M6-32 Administration Guide. See Hardware Installation Documents.