Prepare to Power Off the Switch
Perform this task before powering off the switch.
-
Notify affected users that the switch is to be shut down.
-
Set the priority of the switch to be removed to the lowest.
Wait for any handover to complete.
-
Create a backup of the switch configuration for the switch to be
removed.
Refer to Performing Backups in Oracle Fabric Manager 5.0.2 Administration Guide.
-
Disconnect the power cords at the rear of the switch to power it off.
See Power Off the Switch.