To install the server, you must have the following tools:
No. 2 Phillips screwdriver
ESD mat and grounding strap
For DC power supply, a 7mm socket wrench or nut driver
For the initial installation configuration, you must provide a terminal device for use as a console device. You can use these types of devices:
ASCII terminal
Workstation
Terminal server
Computer, such as a laptop running terminal emulation software
Patch panel connected to a terminal server
Cables needed to connect the console device to the SER MGT port