Go to main content
Netra SPARC S7-2 Server Installation Guide

Exit Print View

Updated: January 2017
 
 

Connect AC Power Cords

Prepare the power cords by routing them from the AC power source to the server.


Caution

Caution  - Do not attach power cables to the power supplies until you have connected the server to a serial terminal or a terminal emulator (PC or workstation). The server goes into Standby mode and Oracle ILOM on the SP initializes as soon as a power cable connects a power supply to an external power source. System messages might be lost after 60 seconds if a terminal or terminal emulator is not connected to the SER MGT port before power is applied.



Note -  Oracle ILOM signals a fault if both power supplies are not cabled at the same time, since it will be a nonredundant condition. Do not be concerned with this fault in this situation.
  1. (Optional) Connect the chassis ground studs to earth ground.

    See Connect the Chassis Ground Wire.

  2. Route the power cords from the AC power source to the rear of the server.

    Do not attach the power cords to the power supplies at this time.


    image:Figure showing where the power cords plug into the power supplies.
  3. Connect a device to the SER MGT port.

    See Connect a Terminal or Emulator to the SER MGT Port.

Related Information