Facility Power Checklist

Complete the following checklist to ensure that the facility power requirements are met for the data center where the server is installed.

Facility Power Considerations
Yes
No
N/A
Comment
Do you know the required operating voltage and electric current level of the server and peripherals?
Are enough power outlets provided within 2 meters (6.5 feet) for each rack?
Do the power outlets have appropriate socket receptacles?
Will optional ground cables be attached to the rack?
Are the circuit breakers for the equipment suitable for voltage and current-carrying capacities?
Does the power frequency meet the equipment specifications?
Will system power be delivered from two separate power grids?
Is there a UPS to power the equipment?
Do you have the minimum required power sources to support the power load for the new hardware? Use kilowatt (kW)/kilovolt (kVA) to express power load.