About the Installation Procedure

Installation Procedure Overview

About Server Features and Components

Server Components

Front Panel Status Indicators, Connectors, and Drives

Back Panel Status Indicators, Connectors, and PCIe Slots

Preparing for Server Installation

Shipping Inventory

Tools and Equipment Needed for Installation

ESD and Safety Precautions

Installing the Server Into a Rack

Installation Prerequisites

Rack Requirements

Safety Precautions When Rackmounting the Server

Rackmount Kit Contents

Stabilize the Rack for Installation

Install Mounting Brackets

Mark the Rackmount Location

Attach Tool-less Slide-Rail Assemblies

Install the Server Into the Slide-Rail Assemblies

Install the Cable Management Arm

Remove the Cable Management Arm

Verify Operation of Slide-Rails and CMA

Install Oracle Disk Shelves

Cabling the Server

Rear Cable Connections and Ports

Ethernet Ports

Connect Data Cables to the Server

Connect the Cluster Cables

Connect to Oracle DE2 Disk Shelves

Powering On and Initially Configuring the Server

Prerequisites

Clustering Guidelines

Power on the Oracle Disk Shelves and Servers

Configure the Primary Network Interface

Initial Configuration

Troubleshooting Installation Issues

Connecting to Oracle ILOM

Oracle ILOM Hardware and Interfaces

Network Defaults

Logging In to Oracle ILOM Using a Local Serial Connection

Logging In to Oracle ILOM Using a Remote Ethernet Connection

Troubleshooting the Service Processor Connection

Resetting the Service Processor Using Oracle ILOM

Reset the Service Processor From the Server Back Panel

Recover Root Account Password

Powering Down the Server

Graceful Server Power Down

Emergency Server Power Down Using the Power Button

Emergency Server Power Down Using the Oracle ILOM CLI

Emergency Server Power Down Using the Oracle ILOM Web Interface

Reset the Server

Use the Oracle ILOM Command-Line Interface to Reset the Server

Use the Oracle ILOM Web Interface to Reset the Server

Installation Troubleshooting

Technical Support Information Worksheet

Locating the System Serial Number

Getting Server Firmware and Software

Firmware and Software Updates

Firmware and Software Access Options

Download Firmware and Software Using My Oracle Support

Index

Safety Precautions When Rackmounting the Server

This section describes safety precautions you must follow when installing the server into a rack.


Caution

Caution - Deploy the anti-tilt bar or legs on the equipment rack before beginning an installation.



Caution

Caution - Always load equipment into a rack from the bottom up so that the rack will not become top-heavy and tip over. Deploy your rack's anti-tilt bar to prevent the rack from tipping during equipment installation.



Caution

Caution - Elevated operating ambient temperature: If the server is installed in a closed or multi-unit rack assembly, the operating ambient temperature of the rack environment might be greater than room ambient temperature. Therefore, consideration should be given to installing the equipment in an environment compatible with the maximum ambient temperature (Tma) specified for the server. For server environmental requirements, refer to Sun Server X3-2 Site Planning Guide, “Preparing the Site for Installation,” at http://docs.oracle.com/cd/E22368_01/index.html.



Caution

Caution - Reduced airflow: Installation of the equipment in a rack should be such that the amount of airflow required for safe operation of the equipment is not compromised.



Caution

Caution - Mechanical loading: Mounting of the equipment in the rack should be such that a hazardous condition is not created due to uneven mechanical loading.



Electrical

Caution - Circuit overloading: Consideration should be given to the connection of the equipment to the supply circuit and the effect that overloading of the circuits might have on over-current protection and supply wiring. Appropriate consideration of equipment nameplate power ratings should be used when addressing this concern.



Electrical

Caution - Reliable earthing: Reliable earthing of rackmounted equipment should be maintained. Particular attention should be given to supply connections other than direct connections to the branch circuit (for example, use of power strips).



Caution

Caution - Slide-rail-mounted equipment is not to be used as a shelf or a work space.