JavaScript is required to for searching.
Skip Navigation Links
Exit Print View
Oracle ZFS Storage ZS3-ES

Installation Guide

search filter icon
search icon

Document Information

Using This Documentation

About This Documentation

Related Documentation

Feedback

Support and Accessibility

About the Installation Procedure

Installation Procedure Overview

About Server Features and Components

Server Components

Front Panel Status Indicators, Connectors, and Drives

Back Panel Status Indicators, Connectors, and PCIe Slots

Preparing for Server Installation

Shipping Inventory

Tools and Equipment Needed for Installation

ESD and Safety Precautions

Installing the Server Into a Rack

Installation Prerequisites

Rack Requirements

Safety Precautions When Rackmounting the Server

Rackmount Kit Contents

Stabilize the Rack for Installation

Install Mounting Brackets

Mark the Rackmount Location

Attach Tool-less Slide-Rail Assemblies

Install the Server Into the Slide-Rail Assemblies

Install the Cable Management Arm

Remove the Cable Management Arm

Verify Operation of Slide-Rails and CMA

Install Oracle Disk Shelves

Cabling the Server

Rear Cable Connections and Ports

Ethernet Ports

Connect Data Cables to the Server

Connect the Cluster Cables

Connect to Oracle DE2 Disk Shelves

Powering On and Initially Configuring the Server

Prerequisites

Clustering Guidelines

Power on the Oracle Disk Shelves and Servers

Configure the Primary Network Interface

Initial Configuration

Troubleshooting Installation Issues

Connecting to Oracle ILOM

Oracle ILOM Hardware and Interfaces

Network Defaults

Logging In to Oracle ILOM Using a Local Serial Connection

Logging In to Oracle ILOM Using a Remote Ethernet Connection

Troubleshooting the Service Processor Connection

Resetting the Service Processor Using Oracle ILOM

Reset the Service Processor From the Server Back Panel

Recover Root Account Password

Powering Down the Server

Graceful Server Power Down

Emergency Server Power Down Using the Power Button

Emergency Server Power Down Using the Oracle ILOM CLI

Emergency Server Power Down Using the Oracle ILOM Web Interface

Reset the Server

Use the Oracle ILOM Command-Line Interface to Reset the Server

Use the Oracle ILOM Web Interface to Reset the Server

Installation Troubleshooting

Technical Support Information Worksheet

Locating the System Serial Number

Getting Server Firmware and Software

Firmware and Software Updates

Firmware and Software Access Options

Download Firmware and Software Using My Oracle Support

Index

Install the Server Into the Slide-Rail Assemblies

Use this procedure to install the server chassis, with mounting brackets, into the slide-rail assemblies that are mounted to the rack.


Caution

Caution - This procedure requires a minimum of two people because of the weight of the server. Attempting this procedure alone could result in equipment damage or personal injury.



Caution

Caution - Always load equipment into a rack from the bottom up so that the rack will not become top-heavy and tip over. Extend your rack's anti-tilt bar to prevent the rack from tipping during equipment installation.


  1. Push the slide-rails as far as possible into the slide-rail assemblies in the rack.
  2. Position the server so that the rear ends of the mounting brackets are aligned with the slide-rail assemblies that are mounted in the rack.
  3. Insert the mounting brackets into the slide-rails, and then push the server into the rack until the mounting brackets encounter the slide-rail stops (approximately 30 cm, or 12 inches).

    Figure 8 Inserting the Server with Mounting Brackets Into the Slide-Rails

    image:Figure showing the server with mounting brackets being inserted into the slide-rails.

    Figure Legend

    1 Inserting mounting bracket into slide-rail

    2 Slide-rail release button

    3 Slide-rail lock

  4. Simultaneously push and hold the green slide-rail release buttons on each mounting bracket while you push the server into the rack. Continue pushing the server into the rack until the slide-rail locks (on the front of the mounting brackets) engage the slide-rail assemblies.

    You will hear an audible click.


    Figure 9 Sliding the Server Into the Rack

    image:Figure showing the server being pushed back into the rack.

    Caution

    Caution - Verify that the server is securely mounted in the rack and that the slide-rail locks are engaged with the mounting brackets before you install the optional cable management arm.


Related Information