JavaScript is required to for searching.
Skip Navigation Links
Exit Print View
Oracle SuperCluster M6-32

Owner's Guide: Installation

PDF
search filter icon
search icon

Document Information

Using This Documentation

Product Documentation Library

Feedback

Installing SuperCluster M6-32

Hardware Installation Overview

Weight Specifications

Hardware Installation Task Overview

Hardware Installation Documents

Preparing the Site (Storage Rack and Expansion Racks)

Prepare the Site for the Racks

Storage Rack Components

Physical Specifications

Reviewing Power Requirements

PDU Power Specifications

Facility Power Requirements

PDU Thresholds

Preparing for Cooling

Heat Dissipation Specifications

Airflow Requirements

Perforated Floor Tiles

Environmental Specifications

Preparing the Network

Network Topology

Network Infrastructure Requirements

Compute Server Default Host Names and IP Addresses

Install Cable Drops

Prepare DNS

Cabling SuperCluster M6-32

Compute Server Network Components

Storage Rack Network Components

Cable the ZFS Storage Appliance

ZFS Appliance Power Cord Connection Reference

ZFS Storage Appliance Cabling Reference

Cable IB Switches

Leaf Switch 1 Cabling Reference

Leaf Switch 2 Cabling Reference

IB Switch-to-Switch Cabling Reference

Cable the Ethernet Management Switch

Ethernet Management Switch Cabling Reference

Connect SuperCluster M6-32 to the Facility Networks

Connecting Expansion Racks

Expansion Rack Overview

Expansion Rack Components

Expansion Rack Layouts

Installing Expansion Racks

One Expansion Rack Cabling

Two Expansion Racks Cabling

Three Expansion Racks Cabling

Four Expansion Racks Cabling

Five Expansion Racks Cabling

Six Expansion Racks Cabling

Seven Expansion Racks Cabling

Expansion Rack Default IP Addresses

Understanding Internal Cabling (Expansion Rack)

Oracle ILOM Cabling

Administrative Gigabit Ethernet Port Cabling

Single-Phase PDU Cabling

Three-Phase PDU Cabling (Full Rack)

IB Network Cabling

Glossary

Index

A

C

D

E

F

G

H

I

M

N

O

P

S

T

I

IB HCA, index iconCompute Server Network Components
IB network, index iconNetwork Topology
IB switches
cabling, index iconCable IB Switches
cabling reference (leaf switch 1), index iconLeaf Switch 1 Cabling Reference
cabling reference (leaf switch 2), index iconLeaf Switch 2 Cabling Reference
location, index iconStorage Rack Network Components
switch-to-switch cabling, index iconIB Switch-to-Switch Cabling Reference
installation task overview, index iconHardware Installation Task Overview
installing
cable drops, index iconInstall Cable Drops
expansion racks, index iconInstalling Expansion Racks
SuperCluster M6-32, index iconInstalling SuperCluster M6-32
internal cabling, expansion racks, index iconUnderstanding Internal Cabling (Expansion Rack)
IP addresses
compute server, default, index iconCompute Server Default Host Names and IP Addresses
default expansion rack, index iconExpansion Rack Default IP Addresses