Installation Task Overview

Perform these tasks to install and configure the server.

Step
Description
Links
1.
Review the product notes for any late-breaking news about the server.
2.
Review the server features, specifications, and site requirements.
3.
Confirm that you received all of the items you ordered.
4.
Learn the server features, controls, and LEDs required for installation.
5.
Take safety and ESD precautions and assemble the required tools.
6.
Install the server into a rack.
7.
Attach data and management cables to the server.
8.
Connect the power cords to the server, configure the Oracle ILOM SP, power on the server for the first time, and set up the operating system.

Related Information

  • SPARC T7 Series Servers Product Notes

  • SPARC T7-4 Server Safety and Compliance Guide

  • SPARC T7 Series Servers Administration Guide