Go to main content

Oracle® Server X7-2L Service Manual

Exit Print View

Updated: January 2021
 
 

Install the Battery

  1. Unpack the replacement battery.
  2. Press the new battery into the battery retainer.

    Note -  If disconnected during battery removal, reconnect the auxiliary signal cable to the disk backplane and the SAS cables to the Internal HBA. For more information, see Servicing the Disk Backplane (FRU) and Servicing SAS Cables (FRU).
  3. Return the server to operation.
    1. Install the server top cover.

      See Install the Server Top Cover.

    2. Return the server to the normal rack position.

      See Return the Server to the Normal Rack Position.

    3. Reconnect the power cords to the server power supplies, and power on the server.

      See Reconnect Power and Data Cables and Power On the Server.

    4. Verify that the System OK LED indicator is lit.

      Note -  If the service processor is configured to synchronize with a network time server using the Network Time Protocol (NTP), the Oracle ILOM SP clock will be reset as soon as the server is powered on and connected to the network; otherwise, proceed to the next step.
  4. If the service processor is not configured to use NTP, you must do one of the following:

Related Information