Understanding the Installation
Understanding Management and Power Cabling
Single-Switch Location Guidelines
Attach the Rails to the Switch
Attach Telco Adapters to the Rack Slides
Attach the Rack Slides to the Rack
Install the Switch Into the Rack
Install the Air Duct and Front Support
Attach Data and Management Cables
Prepare the Front Support and Small Air Duct
Verify the DHCP-Assigned IP Address and Host Name
Configure Network Management From the CLI (SER MGT)
Log Into the Oracle ILOM Web (NET MGT)
Log Into the Oracle ILOM CLI (NET MGT)
Log Into the Oracle ILOM CLI (SER MGT)
Change a SEFOS User Privilege Level
Configure Network Management From the Web Interface
Configure Network Management From the CLI
Log Out of the Oracle ILOM CLI
Configuring the SEFOS Environment
Configuring the Switching Feature
Configuring the Routing Feature
Check Switch Status (Oracle ILOM)
Physical Specifications
Configure Port Mirroring
Understanding Management and Power Cabling
Attach Power Cords
Route Cables
Power Cord Specifications
Electrical Specifications
Install a Power Supply
Power Off a Power Supply
Power On a Power Supply
Remove a Power Supply
Servicing Power Supplies
Power Off a Power Supply
Power Off a Power Supply
Power On a Power Supply
Prepare the Front Support and Small Air Duct
Prepare the Front Support and Small Air Duct
Preparing for Installation
Preparing for Service